Poland - Voltage control systems

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
22 August 2019
Opportunity publication date
23 July 2019
Category
31161900
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The scope of the main works covered by the contract includes: a. installation and commissioning of the system for monitoring the condition of the TR1 transformer GN isolators, b. inspection of the TR1 transformer together with the removal of oil leaks, inspection of the on-load tap-changer, testing of the Buchholz relays, inspection of the control, measurement and protection equipment, electrical measurements, oil testing, c. inspection, cleaning, maintenance of contacts, transformers and earthing switches on the foreground of the TR1,d. replacement of lightning arresters with surge arresters together with tripping counters on the foreground and at the star point of the TR1 transformer,e. measurements of working and protective earth resistance,f. assembly and disassembly of scaffolding in order to perform all the work,g. preparation of a report on the performed work.

Opportunity closing date
22 August 2019
Value of contract
to be confirmed

About the buyer

Address
PGE Energia Ciepła S.A. ul. Złota 59 Warszawa 00-120 Poland
Contact
rafal.olszowski@gkpge.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?