Poland - Turbines and engines

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
21 January 2022
Opportunity publication date
22 December 2021
Category
42110000: Tu
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

"Supply and installation of high efficiency cogeneration units cooperating with existing technological systems in Heat Plants in Barlinek and Myślibórz".
The subject matter of the contract is supply and installation of a source of highly efficient cogeneration units in Barlinek on plot no. 733 and 2096/2, precinct 1, located at ul. Św. Bonifacego 25, together with provision of maintenance service in the guarantee period. The subject of the contract is the design, supply and installation of a source of electrical energy and heat based on a cogeneration system with electrical power below 1 MW, consisting of a high-efficiency generation unit in which the driving unit will be a combustion piston engine, fuelled with natural gas type E (GZ50). The equipment should be located in a designated room in the existing building of the Heat Plant in Barlinek on level 0. The order covers the supply, installation and start-up of a complete system for cogeneration of electricity and heat for continuous operation. Produced energy will be discharged into heat and power network and resold. The subject of the contract on the electrical side also includes the installation of the necessary transformers and switchgears for the gas cogeneration system (hereinafter referred to as GUK), control and instrumentation systems, installations and other elements necessary for the operation of GUK. In terms of heat management and heat recovery, the Contracting Authority expects a complete installation, flue gas discharge systems, exchanger stations, pumping systems and installations that enable the achievement of objectives contained in this PFU. GUK should meet the conditions for high-efficiency gas cogeneration specified in Polish and EU legislation. It will be designed for continuous operation with full load, i.e. throughout the year with breaks resulting only from the required, as per recommendations of the engine manufacturer, downtime for maintenance work. The scope of construction works includes the execution of a complete cogeneration system cooperating with the existing infrastructure of the heating system belonging to SEC Region Sp. z o.o. and with the network of ENEA Operator Sp. z o.o. The basic purpose of the construction and subsequent operation of a high-efficiency cogeneration system powered by natural gas type E (GZ-50) is: the production of electricity and heat with the most effective possible use of the chemical energy contained in the gas fuel, limiting the impact of the combustion of fuels for energy production on the natural environment. Local inspection will be possible at the following places and dates: - Heating plant Barlinek: 25 Św. Bonifacego St., 74-320 Barlinek on 03.01.2022 or 11.01.2022 at 12.00-13.30 p.m. (after previous announcement of arrival at phone number 661 911 019) Participation in local inspection is voluntary and lack of participation will not cause rejection of offer.The Contracting Authority shall convene the meeting of contractors within the meaning of art. 136 par. 1 of the PPL in order to clarify the content of the To the meeting of contractors, any interested entity can participate, regardless of their status in the proceedings, i.e. questions asked or willingness to participate. After the meeting the Contracting Authority shall prepare information containing the questions asked at the meeting to clarify the content of the ToR and answers to those questions, without indicating the sources of the questions. The contractors' meeting will be held on 13.01.2022 in remote mode with the use of Microsoft Teams communicator after prior notification by 12.01.2022 to the e-mail address piotr.pluciennik@sec.com.pl The subject matter of the contract is the supply and installation of a source of high-efficiency cogeneration in Myślibórz on plot no. 459, precinct 1, located at 13 Lipowa Street, together with the provision of maintenance services during the period of the guarantee granted. The subject of the contract is the design, supply and installation of a source of electrical energy and heat based on the cogeneration system with electrical power below 1 MW, consisting of a highly efficient generation unit in which the driving unit will be a combustion piston engine, fuelled with natural gas type E (GZ50). The equipment will have to be located in a designated room in the existing building of the Heat Generating Plant in Myślibórz, on level 0. The order covers the delivery, assembly and start-up of a complete system for co-generation of heat and electrical energy intended for continuous operation. The produced energy will be discharged into the district heating and power network and will be resold. The subject of the contract on the electrical side also includes the installation of the necessary transformers and switchgears for the gas cogeneration system (hereinafter referred to as GUK), control and instrumentation systems, installations and other elements necessary for the operation of GUK. In terms of heat management and heat recovery, the Contracting Authority expects a complete installation, flue gas discharge systems, exchanger stations, pumping systems and installations that enable the achievement of objectives contained in this PFU. GUK should meet the conditions for high-efficiency gas cogeneration specified in Polish and EU legislation. It will be designed for continuous operation with full load, i.e. throughout the year with breaks resulting only from the required, as per recommendations of the engine manufacturer, downtime for maintenance work. The scope of construction works includes the execution of a complete cogeneration system cooperating with the existing infrastructure of the heating system belonging to SEC Region Sp. z o.o. and with the network of ENEA Operator Sp. z o.o. The basic purpose of the construction and subsequent operation of a high-efficiency cogeneration system powered by natural gas type E (GZ-50) is: the production of electricity and heat with the most effective possible use of the chemical energy contained in the gas fuel, limiting the impact of the combustion of fuels for energy production on the natural environment. It will be possible to conduct a site inspection at the following places and dates: - Ciepłownia Myślibórz: ul. Lipowa 13, 74-300 Myślibórz on 03.01.2022 or 11.01.2022 at 10.00-11.30 a.m. (after prior announcement of arrival at phone number 661 911 019) Participation in the site inspection is voluntary and lack of such participation will not result in rejection of the offer.The Contracting Authority shall convene the meeting of contractors within the meaning of art. 136 item 1 of the PPL in order to clarify the contents of the ToR, the meeting of contractors can be attended by any interested entity, regardless of their status in the proceedings, i.e. questions asked or willingness to participate. After the meeting the Contracting Authority shall prepare information containing the questions asked at the meeting to clarify the content of the ToR and answers to those questions, without indicating the sources of the questions. The contractors' meeting will be held on 13.01.2022 in remote mode with the use of Microsoft Teams communicator after prior notification by 12.01.2022 to the e-mail address piotr.pluciennik@sec.com.pl

Opportunity closing date
21 January 2022
Value of contract
to be confirmed

About the buyer

Address
SEC Energia Sp. z o.o. ul. Zbożowa 4 Szczecin 70-653 Poland
Contact
przetargi@sec.com.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?