Germany - Structural work

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
20 August 2020
Opportunity publication date
08 July 2020
Category
45223220: St
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

As an ultra-modern laboratory building, MedForCe is of particular importance for the future development of Münster as a science location.MedForCe is to be built on the Domagkstraße/Coesfelder Kreuz/Rishon-Le-Zion-Ring site with an effective area NF 1-6 of probably 12,650 m2 . the building complex will accommodate the institutes for medical microbiology, clinical virology and hygiene, a microbiology/virology laboratory animal facility, a quarantine experimental animal facility and research areas. For the above-mentioned institutes, teaching areas, laboratory areas with protection level 1 and 2 according to the Ordinance on Biological Substances and a laboratory area with safety level 3 according to the Ordinance on Biological Substances as well as a laboratory area according to the Ordinance on Genetic Engineering Safety and Security will be provided. The BBIM is an independent building but is often networked with MedForCe. Both the internal structure (identical laboratory clusters) and the internal and external appearance of the two projects should not differ. Both buildings have a separate access to Domagkstraße and an independent vertical access, but a common logistics in the basement. In addition to standard office and laboratory space, the BBIM will include a GMP facility, a flow cytometric unit and an RNA sequencing laboratory. Primarily laboratory areas of protection level 1 and 2 in accordance with BioStoffV and GentSV are planned. 3,850 m2 of floor space is currently expected to be available for the planned tasks.
As an ultra-modern laboratory building, MedForCe is of particular importance for the future development of Münster as a science location.MedForCe is to be built on the Domagkstraße/Coesfelder Kreuz/Rishon-Le-Zion-Ring site with an effective area NF 1-6 of probably 12,650 m2 . the building complex will accommodate the institutes for medical microbiology, clinical virology and hygiene, a microbiology/virology laboratory animal facility, a quarantine experimental animal facility and research areas. For the above-mentioned institutes, teaching areas, laboratory areas with protection level 1 and 2 according to the Ordinance on Biological Substances and a laboratory area with safety level 3 according to the Ordinance on Biological Substances as well as a laboratory area according to the Genetic Engineering Safety Ordinance will be provided. The BBIM is an independent building, but in many cases networked with MedForCe, and the inner structure (identical laboratory clusters) as well as the inner and outer appearance of the two projects should not differ. Both buildings have a separate access to Domagkstraße and an independent vertical access, but a common logistics in the basement. In addition to standard office and laboratory space, the BBIM will include a GMP facility, a flow cytometric unit and an RNA sequencing laboratory. Primarily laboratory areas of the protection level 1 and 2 according to BioStoffV and GentSV are planned.the planned tasks allow an effective area of approx. 3,850 m2 to be expected at present.lot 2BBIM:Backfilling of work rooms: approx. 3 900 m3;Excavated soil with waste disposal: approx. 1 200 t;Basic lines: approx. 650 m;Formwork: approx. 30 000 m2;Concrete: approx. 8 500 m3;Reinforcing steel: approx. 1 100 t;Masonry: approx. 1 00 m2;Insulation work: approx. 2 300 m2.

Opportunity closing date
20 August 2020
Value of contract
to be confirmed

About the buyer

Address
UKM Infrastruktur Management GmbH Albert-Schweitzer-Campus 1, Geb. D5 Münster 48149 Germany
Contact
vergabe.ukm.im@ukmuenster.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?