Germany - Steam Boiler
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 13 July 2020
- Opportunity publication date
- 15 June 2020
- Category
- 42162000: St
- Value of contract
- to be confirmed
- Your guide to exporting
Description
The object of the contract is the planning and new construction of the firing line of boiler 15, consisting of grate system with deslagger, firing with combustion air systems, steam generator with cleaning equipment and ash removal, auxiliary equipment and the associated electrostatic precipitator, while basically retaining the existing boiler framework; complete electrical and I&C technology for the above measures and all structural measures of the Wuppertal waste-to-energy plant (MHKW) required within the scope of the conversion, as well as commissioning and trial operation.
The municipally owned AWG Abfallwirtschaftsgesellschaft mbH Wuppertal (AWG) has been operating a waste-to-energy plant (MHKW) at the Wuppertal site since 1976. The downstream flue gas cleaning systems have been adapted or extended to the state of the art since commissioning in 2004/2009.The object of the order is the planning and new construction of the firing line of boiler 15, consisting of grate system with deslagger, firing with combustion air systems, steam generator with cleaning equipment and ash removal, auxiliary plants as well as with the associated electrostatic precipitator while basically retaining the existing boiler framework; complete electrical and I&C technology for the above measures and all structural measures of the Wuppertal waste-to-energy plant (MHKW) required within the scope of the conversion, as well as commissioning and trial operation.The scope of supply and services of the Contractor, as the subject of the contract according to the above definition, will be referred to as boiler 15 in the following: The furnace thermal output of boiler 15 shall be approx. 45 MWth, the permissible steam generation shall be approx. 50 t/h. The live steam parameters of the boiler outlet (operating data) are 36 bara and 385oC.In the course of this tender, the following supplies and services shall be offered and priced:- Design;- Manufacture;- Delivery;- Installation under consideration and maintenance of the ongoing operation of the MHKW, especially of the other boiler lines;- Commissioning and trial operation;- Documentation.
- Opportunity closing date
- 13 July 2020
- Value of contract
- to be confirmed
About the buyer
- Address
- AWG Abfallwirtschaftsgesellschaft mbH Wuppertal Korzert 15 Wuppertal 42349 Germany
- Contact
- haci.celik@awg.wuppertal.de
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.