Poland - Solar photovoltaic modules

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
23 July 2019
Opportunity publication date
17 June 2019
Category
9331200: Solar photovoltaic modules
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The order includes preparation of technical documentation and installation of 330 installations producing electricity/thermal energy with renewable sources, i.e.: 1) 304 photovoltaic installations, 2) 26 solar collector installations. In the field of photovoltaics, photovoltaic installations with associated infrastructure, connection to the internal power installation and commissioning of the installation should be performed.The scope of installation works includes: - installation of PV module support structures - installation of PV modules - installation of PV modules on support structures - installation of wiring on the DC and AC side - modernisation of the existing electrical switchgear - installation of the energy meter for the purposes of measuring the energy produced by the installation - installation of the PV inverter - installation tests and tests to check the correct functioning of the system - commissioning of the system and regulations - user training / maintenance.The scope of construction works includes: - making necessary assembly holes in order to introduce devices - bricking up assembly holes after the introduction of devices - making culverts in places of cable route transitions through walls, roof or other obstacles - sealing culvertsMicro photovoltaic installation must consist primarily of the following elements:- photovoltaic panels - support structure - DC/AC inverter with the function of measuring the generated electricity - DC and AC installation - metering and billing system at the place of supply/collection of electricity Referring to solar collectors, the subject of the contract is the construction of a solar installation producing thermal energy for the facility's own needs. The system will include solar collectors mounted on the roof or façade of the facility, water heater with a system ensuring the continuity of the installation and the necessary fittings.The scope of installation work includes: - installation of assembly elements under the collectors - installation of collectors on the structure - piping - installation of the heater - installation of the necessary fittings and automation - connection to the installation of the primary source - tests of the installation and checking the correct operation of the equipment - commissioning of the system and regulations - user training / maintenance The scope of construction work includes:- making the necessary mounting holes in order to introduce the devices - bricking up the mounting holes after the devices have been introduced - making the culverts in the places of cable routes through walls, roof or other obstacles - sealing the culverts - solar installation should consist of such elements as:- solar collectors - capacitive heater - solar group with controller - element measuring the amount of heat produced by the system - shut-off, measuring and protecting fittings - system protecting against pressure increase in the system - connecting piping - solar fluid - insulation - mounting elements - system maintaining voltage on electric devices of the solar system.The following sets of solar collectors are envisaged: - 2 flat-plate collectors, supplying a capacitive heater with a minimum volume of min. - 240 dm3- 3 flat-plate collectors, supplying a capacitive heater with a capacity of min. - 270 dm3- 4 flat-plate collectors, supplying a capacitive heater with a volume of min. - 370 dm3

Opportunity closing date
23 July 2019
Value of contract
to be confirmed

About the buyer

Address
Gmina Miejska Kościan al. Kościuszki 22 Kościan 64-000 Poland
Contact
bzp@koscian.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?