Poland - Solar photoelectric modules

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
28 January 2022
Opportunity publication date
31 December 2021
Category
9331200: Sol
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The subject matter of the contract is the supply and installation of photovoltaic installations in the municipality of Wólka.2 The order is executed under the project entitled "RES IN THE Municipality of WÓLKA- STAGE II - installation of heat pumps, solar collectors, biomass stoves and photovoltaic cells" co-financed by EU funds under the Regional Operational Programme for the Lubelskie Voivodeship for 2014-2020 Priority Axis 4 Environmentally Friendly Energy Measure 4.1 Support for the use of RES.
The subject matter of the contract is the supply and installation of photovoltaic installations in the municipality of Wólka.2 The order is carried out under the project entitled "RES IN THE Municipality of WÓLKA - STAGE II - installation of heat pumps, solar collectors, biomass stoves and photovoltaic cells", co-financed by EU funds under the Regional Operational Programme for the Lubelskie Voivodeship for 2014-2020 Priority Axis 4 Environmentally-Friendly Energy Measure 4.1 Support for the use of RES.3 The subject matter of the contract includes, among others, the followingThe subject matter of the contract includes, among others, delivery and installation of sets of photovoltaic installations in the municipality of Wólka, including: 1) delivery and installation of 5 pieces of photovoltaic installations of min. 2,28 kW, in 5 indicated locations;2) supply and installation of 105 photovoltaic installations of min. 3,42 kW, in 105 indicated locations;3) installation made on the basis of photovoltaic modules monocrystalline panels of min. 380 W;4) inverters assembled under the contract must have about 1 kW of reserve power, allowing for the connection of additional 1 kW,5) installation of supporting structures for photovoltaic modules, 6) installation of photovoltaic panels on the structure, 7) installation of solar wiring between the modules and inverter,8) installation of the main installation for connecting the inverter to the main switchboard of the building,9) installation of the RDC switchboard,10) installation of the inverter,11) installation of the RAC switchboard,12) implementation of electric shock protection,13) implementation of surge protection,14) tests, measurements, adjustments and commissioning of the installation,15) preparation of documentation for the submission of a micro-installation connection to the power grid of the regional distribution system operator,16) training of the Users in the proper operation of the completed installations,17) preparation of service manuals containing the necessary information on the procedure to be followed in the event of unexpected errors in the installation,18) programming and start-up of the installation,19) completion of possible defects in walls, ceilings, and sealing of the roof covering after the passage of cables,20) other elements included in appendix no. 8 to SWZ (design documentation) and the agreement template constituting appendix no. 7 to SWZ).4th The customer requires that during the installation take into account the requirements of people with disabilities and accessibility for them control elements of the installation (installation to ensure the possibility to perform maintenance activities for people with disabilities, in particular moving in a wheelchair).5th The customer requires that the execution of the installation, in one location does not take more than 3 consecutive working days.6.During the warranty period, the Contractor is obliged to perform all maintenance activities required by suppliers of the installed equipment (servicing, inspections, etc.).7 The Contractor guarantees the completed works for a period not shorter than 3 years and not longer than 5 years from the date of signing by the Ordering Party and the Contractor of the final acceptance protocol (warranty period constitutes one of the bid evaluation criteria described in Chapter XVIII of the SWZ).8 The order shall be completed, among others, in accordance with the technical documentation constituting Appendix No. 8 to the SWZ.9Devices, fittings and fixtures installed during the execution of the order must be brand new, compliant with the parameters specified in the technical documentation.10.The execution of the subject matter of the contract should be carried out based on the applicable provisions, in particular of the Act of 7 July 1994 - Construction Law (Journal of Laws of 2020, item 1333, as amended) with executive regulations, by a Contractor having appropriate experience, executive potential and personnel with appropriate experience and qualifications.11. The materials used by the Contractor should meet, in terms of quality, the requirements of the products allowed for circulation and use in the construction industry, set out in Article 10 of the Act of 7 July 1994 - Construction Law (Journal of Laws of 2020, item 1333, as amended) with executive regulations, by a Contractor having appropriate experience, executive potential and personnel with appropriate experience and qualifications.12.

Opportunity closing date
28 January 2022
Value of contract
to be confirmed

About the buyer

Address
Gmina Wólka Jakubowice Murowane 8 Lublin 20-258 Poland
Contact
gmina@wolka.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?