Germany - Site equipment

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
24 May 2022
Opportunity publication date
19 April 2022
Category
45113000
Value of contract
£100k-1m
Your guide to exporting
Report opportunity

Description

Construction logistics, container systems, debris disposal, protective measures
The construction project involves the general refurbishment of the Valentin-Ickelsamer Middle School in Rothenburg ob der Tauber, Dinkelsbühler Straße 3. The Valentin-Ickelsamer Middle School, which currently has more than 400 students, is housed in a listed building that was originally constructed in 1975 and currently has 20 classes. The building is divided into three floors, the division is made as relay floors with a partial basement. A maximum length of approx. 80 m and a maximum width of approx. 72 m can be assumed. Considering the demographic change and changing pedagogical school concepts, a holistically functioning school building is to be created, which fulfills the requirements of safety, environment, accessibility, low follow-up costs, pedagogy and economic efficiency in the long term and sustainably. The school building will be completely renovated in accordance with contemporary energy, functional, fire and sound protection requirements. Accessibility concerns will be taken into account. Furthermore, the renovation includes a reorganization of the fire protection, among other things by adapting the escape routes and additional external staircases. Directly adjacent to the Valentin-Ickelsamer Middle School to the east and north are the buildings of the Reichsstadtgymnasium. To the northwest, west and southwest are the school sports facilities and gymnasium. Further to the north, above an abandoned railroad line, agricultural land borders the area. Below Dinkelsbühler Straße, a general residential area is located in the south. So that the renovation does not have to take place during ongoing operations, school operations will be relocated during the construction period to a container facility on the sports facilities within the school grounds that are in need of renovation. This area will be prepared with its own construction road and infrastructure (supply and disposal) so that the container facility can be operated independently of all other construction measures. Pupils will be transported by bus via a dedicated bus stop directly on Dinkelsbühler Straße. The site rises sharply from the south, starting from Dinkelsbühler Straße, to the north. This results in the split-level arrangement in the existing building. The school building is of mixed construction. The supporting structure consists of a reinforced concrete skeleton construction with columns in a grid of 8.40/8.40 m, column cross-sections D = 40 cm, reinforced concrete precast beams, reinforced concrete semi-precast slabs, d = 30 cm and stiffening reinforced concrete or exposed masonry walls. The existing foundation of the structure consists of single and strip foundations with non-load-bearing reinforced concrete floor slabs. The floor slabs project against the exterior. The existing interior walls are of system partition construction, drywall construction, or clinker masonry construction. The load-bearing concept of the existing building is largely unchanged. Locally, remodeling or new construction measures will be carried out, such as the creation of new wall openings or the installation of the central elevator to create accessibility across all floors, including ramp systems. The existing glass roof over the assembly hall has to be dismantled and replaced due to numerous water ingresses in the past. The new glass roof will have polycarbonate roofing and external sun protection. All existing flat roofs will also be removed. Here, insulation layers with bitumen sealing without gravel covering will be installed on the STB ceilings, which will be secured against lifting by means of bonding. The ventilation units will be installed on the uppermost flat roof, which, due to the load transfer, will be based on steel construction gratings made for this purpose. The facade will be extensively renewed due to numerous defects. The building envelope consists of a listed mullion and transom facade. This is to be replaced and repaired in the course of the refurbishment with original replacement in parts of the ground floor and the entire 1st/2nd upper floors, or refurbishment of an area on the ground floor in accordance with the preservation order. In the case of the listed sun protection systems, the hangings will be replaced in an equivalent manner. The general refurbishment also includes:1. the reorganization of the entire floor plans according to the changed room program through the creation of system and drywall2. The replacement of the entire HLS-E installation and technical equipment3. Renovation measures in the area of outdoor facilitiesThe renovation of the building takes place in an unused condition, the execution is carried out in one go. During the construction phase, the school is housed in a container building northwest of the construction site (on the grounds of the sports field).

Opportunity closing date
24 May 2022
Value of contract
£100k-1m

About the buyer

Address
Schulverband Valentin-Ickelsamer-Mittelschule Marktplatz 1 Rothenburg ob der Tauber 91541 Germany
Contact
vergabestelle@rothenburg.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?