Germany - Services of engineering offices

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
20 May 2019
Opportunity publication date
23 April 2019
Category
71300000
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

For the extension of the delivery room station as well as the removal of the cardiological functional diagnostics, in-house draft plans are already available, fire protection concept and building application are in progress. The total project costs for all construction measures amount to approx. EUR 7.1 million gross (all cost groups).a) Relocation of cardiological functional diagnostics:The rooms of the new ward in the basement of the yellow house are currently empty. The construction measure can be carried out in the storey without major neighborly impairments. Some radiators must be retrofitted. The decentralized ventilation is to be extended into some trapped rooms. The sanitary equipment must be adapted to the new rooms (new washbasins, new WCs for staff and patients). A partial equipment with med. gases is necessary. The fire protection concept is to be implemented, possibly extending an adjacent auxiliary extinguishing system into parts of the new station. One station input must be moved. Construction approx. August 2019 - January 2020.b) Extension of the delivery room station: The construction measures for this are to be carried out in the current station operation divided into 4 construction phases. The adjacent station operation is maintained and must be disturbed as little as possible. A new section of surgery has to be prepared spatially and technically. A comprehensive fire protection concept must be implemented. In parts of the construction project, an interim emergency surgery is to be performed in one of the delivery rooms. A new climate control centre in the attic to supply the ward and the new operating theatre with pre-convectioned air is planned. Some areas must be additionally air-conditioned by means of a chiller. Associated cable routes through the building must be implemented. The sanitary installations must be adapted: New patient toilets and baths, staff sanitary rooms and workrooms are to be created, a birthing tank to be moved to a new location. Radiators must be replaced. New routes for climate must be implemented. The medical gas supply must be expanded. Construction approx. February 2020 - July 2021.c) New construction of an Interdisciplinary Admission Station and an Interventional Neuroradiology Unit on the ground floor of the main building, plus relocation of the neighbouring MRT to new rooms in the emergency room:As part of the reorganization of this central area on the ground floor of the main building, secondary uses must be regrouped and located around the area: MVZ Med. supply centre and KÄV Kassenärztl. supply (approx. 55 m2 NF), pharmacy presence camp (approx. 10 m2 NF). The reorganisation of the neighbouring central entrance/patient admission within this framework seems sensible (approx. 150 m2). The extent to which these are to be included in the conversion remains to be clarified. It is planned to apply for subsidies. The design planning is currently taking place in-house and completely new sub-distributors, routes and supply points are to be prepared in the area. This concerns heating, ventilation, air conditioning, sanitation. Planned construction: following the other construction measures. The technical planning TGA (electrical) is the subject of a separate contract notice.

Opportunity closing date
20 May 2019
Value of contract
to be confirmed

About the buyer

Address
Gesundheitsverbund Landkreis Konstanz, Hegau-Bodensee Klinikum Singen Virchowstr. 10 Singen 78224 Germany
Contact
sabine.heinrichs@kohlergrohe.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?