Germany - Services of engineering offices

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
23 May 2019
Opportunity publication date
24 April 2019
Category
71300000
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The new construction of the Naunhof waterworks is part of the future concept 2030 for the drinking water supply of the Leipzig waterworks. This new treatment plant replaces the existing waterworks Naunhof 1 and 2. The respective wells of the groundwater wells remain intact. A maximum quantity of 50 000 m3/d is assumed to be fed into the drinking water network. The property to be developed belongs to a planned commercial building area according to the land use plan of the city of Naunhof. The planning services of the work phase 3 to 8 (HOAI 2013) for the object planning of engineering structures, the technical planning of technical equipment (process engineering (water treatment)/automation), the technical planning of structural engineering as well as local construction supervision and special services are put out to tender. The planning for the connection of raw water, drinking water, rainwater, sewage and various media pipes are also part of the planning.

Opportunity closing date
23 May 2019
Value of contract
to be confirmed

About the buyer

Address
Kommunale Wasserwerke Leipzig GmbH, Bereich Beschaffung Johannisgasse 7/9 Leipzig 04103 Germany
Contact
christiane.scorna@l.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?