Germany - Road, civil engineering and sewer construction work -: approx. 360 m² of gravel for residents
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 19 February 2025
- Opportunity publication date
- 30 January 2025
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Road, civil engineering and sewer construction work -: Supply approx. 360 m² of gravel for residents; -: Demolish, load and temporarily store approx. 120 m² of in-situ concrete; -: Demolish, load and temporarily store approx. 660 m of concrete kerbs; -: Demolish, load and temporarily store approx. 230 m²concrete paving demolished, loaded and temporarily stored; -: Approx. 370 m² paving slabs demolished, loaded and temporarily stored; -: Approx. 430 t concrete loaded and disposed of RC1 in accordance with EBV; -: Approx. 100 t concrete loaded and disposed of RC2 in accordance with EBV; -: Approx. 100 t concrete loading and disposal RC 3 acc. EBV; -: Approx. 100 t concrete loading and disposal >RC3 acc. EBV; -: Approx. 1,400 m³ soil loosening and interim storage; -: Approx. 400 m³ soil loading and disposal DK0; -: Approx. 400 m³ soil loading and disposal DK1; -: Approx. 400 m³ soil loading and disposal DK2; -: Approx. 100 m³ soil loading and disposal DK3; -: Approx. 3,100 m² subgrade construction; -: Approx. 90 m connection sewer DN 150 delivery and installation; -: Approx. 26 road drains supplied and installed; -: Approx. 480 m subgrade drainage supplied and installed; -: Approx. 1,000 m³ frost protection layer 0\/45 mm supplied, installed and compacted; -: Approx. 1,800 m² gravel base layer 0\/45 mm 20 cm thick supplied, installed and compacted; -: Approx. 518 m² gravel base course 0\/45 mm 25 cm thick supply, install and compact; -: Approx. 290 m concrete raised kerbs supply and install; -: Approx. 530 m concrete base kerbs supply and install; -: Approx. 415 m concrete low kerbs supply and install; -: Approx. 1,700 m² asphalt base course AC 22 TS supply and install; -: Approx. 1,700 m² asphalt surface course AC 8 DS supply and install; -: Approx. 360 m² gravel base course 0\/45 mm 28 cm thick supply and install; -: Approx. 600 m² concrete paving 20\/10\/8 cm color: red colored supply and install; -: Approx. 19 pole lights and luminaire poles supply and install; -: Approx. 565 m underground cable NYY 5x10 mm² supply and install; -: Approx. 2,000 m² road construction slabs, load and dispose of; -: Pick up, load and dispose of approx. 30 m² asphalt pavement; -: Approx. 70 m pipe trench DN200 1.50-2.00 m deep; -: Approx. 310 m pipe trench DN200 2.00-2.50 m deep; -: Approx. 350 m pipe grouting; -: Approx. 380 m solid wall pipe DN200 PVC-U SN 10; -: Approx. 5 concrete manholes DN 1000 2.00-23.50 m deep; -: Approx. 6 concrete manholes DN1000 1.50-2.00 m deep; -: Approx. 140 m pipe trench for connecting sewer DN 150; -: Approx. 140 m solid wall pipe PVC-U DN 100 SN 10; -: Approx. 24 pieces HA manhole SW as plastic inspection chamber; -: Create approx. 26 enclosures SW; -: Approx. 75 m pipe trench DN 300 1.50-2.00 m depth; -: Approx. 80 m pipe trench DN 300 2.00-2.50 m depth; -: Approx. 105 m pipe trench DN 300 2.50-3.00 m depth; -: Approx. 260 m solid wall pipe DN 150 PVC-U DN 150; -: Approx. 3 concrete manholes DN 1000 2.50-3.00 m depth; -: Approx. 3 concrete manholes DN 1000 2.00-2.50 m depth; -: Approx. 4 concrete manholes DN 1000 1.50-2.00 m depth; -: approx. 135 trenches DN 150 RW; -: approx. 135 m solid wall pipe PVC-U DN 150 SN 10 RW; -: approx. 25 HA manhole RW as plastic inspection chamber; -: approx. 22 pieces of enclosures; -: approx. 440 m pipe trench DN 80-125; -: approx. 260 m pressure pipe PE-HD 125x7.4 mm; -: approx. 180 m pressure pipe PE-HD 75x4.5 mm; -: approx. 440 m pressure test; -: approx. 440 m disinfection and flushing; -: approx. 150 m pipe trench DN 32-50 mm; -: approx. 230 m pressure pipe PE-HD 40x3.7 mm; -: approx. 19 pieces of enclosures in the building; -: approx. 7 pieces of enclosures on PE pipe; -: approx. 500 m cable trench 0.3x0.7 m for 1 kV underground cable; -: approx. 370 m trench 0.3x0.60 m for house connections underground cable; -: approx. 420 m trench 0.4x0.9 and 0.5x1.0 m for gas main line; -: approx. 210 m trench 0.4x0.9 m for gas main line
- Opportunity closing date
- 19 February 2025
- Value of contract
- to be confirmed
About the buyer
- Address
- Stadt Malchin
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.