Germany - Public rail transport/public rail transport

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
06 July 2022
Opportunity publication date
08 June 2022
Category
60210000: Pu
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The Zweckverband Nahverkehr Rheinland (NVR), in cooperation with and on behalf of the Verkehrsverbund Rhein-Ruhr AöR (VRR), is awarding public transport services for the S-Bahn Cologne in accordance with public procurement law in a competitive procedure pursuant to the provisions of the GWB and the VgV.The services provided by S-Bahn Köln cover up to 14.2 million Zkm over the term of the contract and are spread over the following lines:Line S 6: Essen Hbf - Düsseldorf - Langenfeld - Cologne - Cologne-WorringenLine S 10: Cologne-Nippes - Cologne Hbf - Cologne-DellbrückLine S 11: Düsseldorf Airport Terminal - Düsseldorf - Neuss - Cologne - Bergisch GladbachLine S 12: Horrem / Sindorf - Cologne - Siegburg/Bonn - Hennef - Au (Sieg)Line S 13: Troisdorf - Bonn Oberkassel (vsl. Line S 19: (Aachen West -) Düren - Cologne - Cologne/Bonn Airport - Siegburg/Bonn - Au (Sieg)Line S 38: Bedburg - Horrem - Cologne Messe/Deutz (vsl. from 12/2029)Line S 68: Langenfeld - Düsseldorf - Wuppertal-Vohwinkel
The subject of this award is the provision of transport services in the area of responsibility of the contracting authority on the basis of a gross transport contract. The services are to be provided on the Cologne S-Bahn and in detail on the following line sections:- Line S 6: Essen Hbf - Düsseldorf - Langenfeld - Cologne - Cologne-Worringen- Line S 10: Cologne-Nippes - Cologne Hbf - Cologne-Dellbrück- Line S 11: Düsseldorf Airport Terminal - Düsseldorf - Neuss - Cologne - Bergisch Gladbach- Line S 12: Horrem / Sindorf - Cologne - Siegburg/Bonn - Hennef - Au (Sieg)- Line S 13: Troisdorf - Bonn Oberkassel (vsl. from 12/2027)- Line S 19: (Aachen West -) Düren - Cologne - Cologne/Bonn Airport - Siegburg/Bonn - Au (Sieg)- Line S 38: Bedburg - Horrem - Cologne Messe/Deutz (from 12/2029)- Line S 68: Langenfeld - Düsseldorf - Wuppertal-VohwinkelAt the beginning of the contract period, the services will cover around 12.3 million train kilometers per standard year. With the exception of Lines S 13 and S 38, operations on the above lines must commence in full by the international timetable change on December 10, 2023. The maximum service offered by the Cologne S-Bahn comprises around 14.1 million train kilometers per standard year. Operation will end at the international timetable change in 2032, presumably on December 12, 2032. The contracting authorities have the unilateral right to exercise an extension option four times per line of around half a year each. It is planned that individual lines will cease to operate even before the international timetable change in December 2032. Which of these lines will be discontinued and at what point they will no longer be operated under the transport contract is the subject of the negotiations in this procedure and of the manufacturer's invitation to tender running in parallel (announcement number 2022/S 100-277416). The transport services to be provided in a first phase from 12/2023 to presumably 12/2029 must be provided with vehicles of the railroad undertaking required for the operating program. For further details, please refer to Sections 1 and 2 of the bidding conditions. The contracting authorities permit the use of second-hand vehicles suitable for urban rail services. Accordingly, the contracting authorities are assuming a minimum vehicle requirement of 120 vehicles, the availability of which must already be proven in the preceding bidding competition. In parallel, the Eigenbetrieb Nahverkehr Rheinland (NVR FA-EB) and the ZV VRR Eigenbetrieb Fahrzeuge und Infrastruktur (ZV VRR FaIn-EB) will procure the new vehicles required for the long-term operation of the Cologne S-Bahn in a separate manufacturer's tender based on the NRW-RRX model. These vehicles will then be successively provided to the rail transport company for the provision of these transport services, probably starting in 09/2027.These services represent the transport services of the S-Bahn Cologne Stage 1. After this, it is planned to award the transport services in batches for 15 years (S-Bahn Cologne Stage 2).

Opportunity closing date
06 July 2022
Value of contract
to be confirmed

About the buyer

Address
Zweckverband Nahverkehr Rheinland Glockengasse 37 - 39 Köln 50667 Germany
Contact
sven.kleine@nvr.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?