Poland - Nuclear reactors and parts of nuclear reactors

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
15 January 2020
Opportunity publication date
09 December 2019
Category
42150000: Nuclear reactors and parts
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The subject of the contract is the design, construction, supply and implementation (installation and commissioning) of a complete thermal neutron starter measurement line for a low power reactor (up to 500 kW) based on a fission chamber, hereinafter referred to as 'the System', in the Maria nuclear reactor, located at the contracting authority's premises.The basic order consists of 3 stages: Stage I includes: preparatory and design works of the System, including: - inventory of current system connections under the supervision of NCBJ employees, - System design - preparation of design documentation taking into account the registered system connections, - development of the System test program, - System design documentation and test program will be submitted for approval by the Employer's employees and for approval by the President of the State Atomic Energy Agency (PAA).Stage I - up to 2 months from the date of concluding the contract.Stage II includes: execution and delivery of the System, including: - execution and delivery of the System with all the equipment made on the basis of the design documentation referred to above, - tests of the System confirming the System's operation in accordance with the assumptions set out in the technical specification, constituting Attachment No. 1 to the ToR and the design documentation, - removal of any possible inconsistencies with the assumptions set out in the technical specification, constituting Attachment No. 1 to the ToR or with the design documentation, - completion of Stage II - up to 6 months after obtaining the consent of the President of PAA for modernization.Stage III includes: System implementation, including: - installation and integration of the System in the Maria reactor, - trial commissioning of the System in order to perform System tests (calibration tests, tests of limit signals and tests of measurement ranges), - preparation of System as-built documentation and presenting it to the Ordering Party, - training of the Employer's employees in System operation, - obtaining the PAA President's consent to start the Maria reactor after the modernization, - System commissioning, - Stage III completion date - up to 2 months after the acceptance of Stage II without reservations, but no later than 18 months after the date of conclusion of the contract, taking into account the conditions set out in Chapter V, V, of the Agreement. SIWZ.

Opportunity closing date
15 January 2020
Value of contract
to be confirmed

About the buyer

Address
Narodowe Centrum Badań Jądrowych ul. Andrzeja Sołtana 7 Otwock (Świerk) 05-400 Poland
Contact
przetargi@ncbj.edu.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?