Germany - Installation of lifts

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
06 August 2020
Opportunity publication date
08 July 2020
Category
45313100: Li
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The Eidelstedt community centre at Alte Elbgaustr. 12 is being renovated, rebuilt and extended and the old building, which was rebuilt in a different way after the war, is being extended by a new building. The old building dates back to 1886, was enlarged in 1927 and severely damaged in the 2nd World War. Until 1951, the building was rebuilt using the old walls in an altered form. The old building has two floors and a partial basement. The outer and inner walls are made of brick masonry. The facades are equipped with WDVS. The ceiling above ground floor is a stone iron ceiling with hollow bricks and iron inlay. The ceiling above ground floor is made of reinforced concrete. The foundations are bricked. The roof structure consists of a filling to create a slight slope, polystyrene insulation and a sealing of bitumen and plastic roofing membrane. The roof was renewed in 2010. The gutters are curtained. Two parts of the old building are to be demolished, the toilet wing and the small wing on the SW side. All wooden windows will be replaced. Inside, considerable alterations are planned. The asbestos-containing floor in the rooms must be removed. In 3 corridors the old floor will be preserved. New interior walls will be made of GK. All false ceilings will be replaced by suspended ceilings. The old cellar will be given a thick coating on the outside. The new building forms a closed block with an atrium together with the two-wing old building. It has two and three storeys and a partial basement. The cellar is a WU construction. The building has a load-bearing construction of ceilings, beams, columns and walls of reinforced concrete and walls of masonry. The interior walls are made of concrete, masonry and GK. The facade is a glass facade on the ground floor, a ventilated facade with aluminium facade panels on the 1st and 2nd floors and fibre cement panels on the base and an ETICS facade on the backsides. The atrium has a glass roof above the 1st floor. The flat roof has polystyrene insulation in the slope with a sealing of bitumen roofing membranes. KS and GK walls are designed as non-load-bearing interior walls. Linoleum, tile, stone and wooden floors are used as floor coverings. Ceilings are installed as GK and wood wool panels with and without acoustic properties.
Subject of this tender is the delivery and construction of an internal, handicapped accessible passenger lift in the closed reinforced concrete shaft of the new building with 4 stops including associated ancillary services as well as testing and acceptance plus a maintenance contract as an optional service.

Opportunity closing date
06 August 2020
Value of contract
to be confirmed

About the buyer

Address
Sprinkenhof GmbH Burchardstraße 8 Hamburg 20095 Germany
Contact
sprvergabestelle@sprinkenhof.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?