Germany - Installation of heating, ventilation and air-conditioning systems

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
18 February 2019
Opportunity publication date
18 January 2019
Category
45331000
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The Albtal-Verkehrsgesellschaft mbH (AVG) is building a new building with office and service space and a small-scale retail trade with a gross floor area of approx. 36,470 sqm (including underground car park) on its own premises on Durlacher Allee in Karlsruhe (Germany), in the "Oststadt" district of Karlsruhe. It borders Gerwigstrasse to the north, EnBW headquarters to the east, Durlacher Allee to the south and Tullastraße to the west. There are other buildings on the site which are used by the client himself and which will be partly rebuilt. The development of the construction site will take place via Durlacher Allee and Tullastraße. The construction site is located within the operating area of the transport company. One area of the eastern and western tracks must always be kept in use and a heating system must be installed as part of the technical building equipment, the central control unit of which is located in the basement. District heating was chosen as the supply medium. A district heating station including distribution systems and associated components is to be supplied by the contractor. Within the total of 10 utilisation units in buildings A and B, heating is provided on the ground floor by recirculation units and on the other floors by cooling/heating ceilings. The interface to the heating/cooling ceilings is formed by the 6-way valve (1200 pcs.) to which it is connected. On the roof there are HKVS ventilation units, which are also connected to the heating system. The piping of the individual HKVS stations on the roof is also part of the contractor's scope of services. The stations themselves will be supplied by the ventilation contractor. Quantity and scope of the order:- Laying of approx. 14,000 m of piping,- Erection of a heating centre in the basement: heat distributor, buffer storage, pump installation, fresh water stations,- Erection of a district heating transfer station approx. 1,700 kW in the basement,- Connection of approx. 1 200 heating/cooling ceilings to the heating network (approx. 15 000 m2),- connection of 4 heat recovery stations to the heating network and the associated plate heat exchangers (3 PWT per supply air unit/4 PWT per exhaust air unit) in the air handling units,- connection of 9 decentralised ventilation units in the local supply area,- regulation of the heating network.

Opportunity closing date
18 February 2019
Value of contract
to be confirmed

About the buyer

Address
AVG – Albtal-Verkehrs-Gesellschaft mbH Tullastr. 71 Karlsruhe 76131 Germany
Contact
vergabestelle@avg.karlsruhe.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?