Germany - Installation of fences, railings and safety devices

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
26 May 2020
Opportunity publication date
28 April 2020
Category
45340000: Fencing, railing and safety equipment installation work
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

BIM Berliner Immobilienmanagement GmbH is planning the construction of a hall for securing cars and motorcycles, including the necessary administrative, storage and examination areas and outdoor parking spaces, on the property at Cecilienstraße 92 in Berlin, district Marzahn-Hellersdorf, OT Biesdorf, which is used by the Berlin police chief's offices.
- 280.00 m cutting road concrete;- 200.00 m3 fixed surface concrete demolishing adjacent road surface 24 kN/m3 D 20-30 cm crushing loading truck AN;- 1 657.00 t waste non-hazardous AVV170504 non-polluted Z0;- 195.00 t waste non-hazardous AVV170302 non-polluted truck AN transp. disposal;- 110.00 t waste hazardous AVV170303* polluted truck AN transp. disposal;- 496.00 m3 soil sewers, excavated, filled, T up to 1.25 m;- 432.00 m3 soil district heating pipe, excavated, filled, T up to 1.25 m;- 215.00 m3 soil sewers, excavated, filled, T 1.25 to 1.75 m;- 174.00 m3 soil sewers, excavated, filled, T 1.75 to 3.00 m;- 340.00 m3 of filling material, pipeline trenches;- 80.00 m3 of material supply, installation, soil replacement pipeline trenches;- 60.00 m3 of material supply, installation, soil replacement pipe trench bottoms;- 272.00 m3 of soil installation, under vegetation areas, supply material;- 648.00 m3 of subsoil improvement, embedding, filling, T 1.25 to 1.75 m;- 174.00 m3 of soil channels, excavate, fill, T 1.75 to 3.00 m/80.00 m3 of subsoil improvement, under vegetation areas, supply material;- 648.00 m3 of subsoil improvement, incorporation/9 638.00 m2 geogrid for stabilisation of base layers;- 3 000.00 m2 geotextile as separating layer, non-woven fabric, GRK 3, laying of geotextile as separating layer, laying of non-woven fabric, GRK 3 crosswise;- 3 145.00 m3 FSS Bk1.8 EV2 120MPa 0/45 D 25-35 cm;- 8 375.00 m2 Hydraulically bound base layer Bk1.8 Cement D 15 cm notches;- 4 238.00 m Joint concrete base layer D 15 cm Space joint;- 8 375.00 m2 concrete floor ZTV Beton-StB Bk1.8 C30/37 (LP) XF4 XM2 single-layer 1-layer D 23 cm;- 386.00 m2 concrete floor ZTV Beton-StB Bk1.8 C30/37 (LP) FD, XF4 XM2 XA2 single-layer 1-layer D 23 cm;- 1 841.00 m joint filling joint compound cold workable Kl. C W/D 12/30 mm;- 3 111.00 m joint filling joint sealant cold workable Kl. C W/D 15/38 mm;- 324.00 m joint filling joint sealant cold workable Kl. C W/D 20/50 mm;- 288.00 m2 concrete paving with natural stone attachment W=20 cm, D=18 cm;- 154.00 m2 concrete paving grid 30 x 20 cm D= 14 cm, anthracite, bonded construction § 7 BerlStrG;- 492.00 m trough gutter gutter shaped stones concrete;- 1 590.00 m concrete shelf HB15/30 Fund. Back support C20/25 D 20 cm;- 155.00 m heavy-duty full-wall PP sewer pipe DN/OD 110;- 235.00 m heavy-duty full-wall PP sewer pipe DN/OD 160;- 33.00 pcs. road gully, standard (H 965 mm);- 11.00 pcs. road gully, shortened version;- 42.00 pcs. attachment for road gully, cl. D 400, channel form;- 43.50 m drainage channel D400 NW 100 mm concrete cover. 16.00 pcs. Sink box Drainage channel D400 NW 100 mm L 0.5 m concrete cover Grating - 73.00 m Drainage channel D400 NW 100 mm L 0.5 m concrete cover Galvanised steel grating, LAU systems;- 8.00 pcs. collision protection bollards;- 9.00 pcs. seat block W/H=50/50 cm, length 100 cm with anchor;- 390.00 m fence steel grating mat double rod mat H 2.03 m mesh width 25/200 mm.

Opportunity closing date
26 May 2020
Value of contract
to be confirmed

About the buyer

Address
Land Berlin (Sondervermögen Immobilien des Landes Berlin) Alexanderstraße 3 Berlin 10178 Germany
Contact
einkauf@bim-berlin.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?