France - Engineering services

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
07 July 2022
Opportunity publication date
22 June 2022
Category
71300000: En
Value of contract
£1m-5m
Your guide to exporting
Report opportunity

Description

The present contract is part of the projects for the electrical connection of the offshore wind farms located in the Central Channel area, which will be awarded during a call for tender launched by the State. It describes the services expected within the framework of the environmental studies contract necessary for the authorisation requests for the onshore and offshore connection works in French waters.
Realization of the initial state of the environment within the meaning of article R. 122-5 of the environmental code of the electrical connection zones (maritime and terrestrial) associated with the offshore wind project zones. This includes:- the production of bibliographic summaries on all environmental compartments;- the sizing of in situ campaigns to be carried out on certain compartments and the associated protocols;- the preparation and realization of in situ measurement campaigns allowing the collection of data;- the processing and analysis of the data acquired during the campaigns to establish the initial state of the environment in the area.The initial state of the environment concerns all of the following compartments:- physical and natural maritime environment: planktonic biocenosis, water and sediment quality, marine and coastal geomorphology, ambient noise, inventory and protection zones, marine and migratory avifauna, chiropterans, marine mammals, marine turtles, large pelagic fish, benthic populations and habitats, phanerogams and macroalgae, fish, mollusks and crustaceans;- physical and natural terrestrial environments: geology, coastline, pedology, environmental noise, hydrology and hydrogeology, polluted sites and soils, natural hazards, fauna, flora, habitats, ecological continuities;- heritage and landscape;- human environment: socio-economic activities structuring the territories (professional fishing, tourism, agriculture, etc.), urban planning.The results of these studies will be used to draw up an initial environmental assessment as part of an impact study of the future connection project (substations and electrical links). All property rights to the results obtained under this contract (raw data, studies, maps, etc.) will be vested in RTE. The target date for the start of these campaigns is March 2023.Preparation of the files and authorizations required for the connection, including the application file for a Declaration of Public Utility (DUP), including the Impact Study, the Application File for a Concession for the Use of the Public Maritime Domain (CUDPM), the DPPAE, the Consultation File, Natura 2000 impact study for the maritime part and for the terrestrial part, Environmental Authorization Application file (DAE), including the Water Law authorization application file, derogation application file for the destruction, disturbance or transfer of terrestrial and marine protected species clearing permit application file and ICPE file, presentation note of the main characteristics of the work within the framework of an application for approval of the project (APO) and/or consultation with mayors and managers (networks and roads), file for compatibility of urban planning documents (MEC), including the analysis of the compatibility of the urban planning documents and, if necessary, the MEC file, file for passage through the sites commission, file for passage through the ad hoc commission for listed and classified monuments, single authorization application file for works in the exclusive economic zone (EEZ).

Opportunity closing date
07 July 2022
Value of contract
£1m-5m

About the buyer

Address
RTE Réseau de Transport d'Electricité 46 avenue Elsa Triolet - CS 20022 MARSEILLE cedex 8 13 417 France
Contact
vanessa-v.oudart@rte-france.com

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?