Poland - Engineering design services
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 13 August 2020
- Opportunity publication date
- 07 July 2020
- Category
- 71320000: En
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Development of design documentation for a construction project called: Conversion of the existing reduction station ś/c into a reduction and measurement station ś/c with a capacity of Q = 2 000 m3/h in the city of Bydgoszcz, Nowa Street.
Development of design documentation for a construction project called: Conversion of the existing reduction station ś/c into a reduction and measurement station ś/c with a capacity of Q = 2 000 m3/h in the city of Bydgoszcz, ul. NowaZakres rzeczowa:a) reduction and measurement station with a capacity of Q = 2 000 m3/hA detailed scope of works:1) execution of a construction design, executive design;2) obtaining all required opinions, permits and decisions, including obtaining, on behalf and for the Awarding Entity, from a competent authority, the final decision on the construction permit or making a notification, on behalf and for the Awarding Entity, of the intention to commence construction works or construction not requiring a construction permit;3) execution of investor's cost estimates;4) exercising author's supervision including five one-off author's supervision services;5) registration of the construction log.The design documentation should consist of:1) a paper version consisting of:a) a construction design (without documents contained in points b - 2 ex. in paper form; b) a construction design (formal part, i.e. consent, declaration, agreement of the owners of the plots of land through which the gas network runs, excerpts from the land register) - 2 ex. c) executive design - 3 copies of the executive design - 3 copies of the executive design - 1 copy of the executive design - 1 copy of the executive design - 1 copy of the executive design - 2 copies of the executive design - 2 copies of the executive design - 2 copies of the executive design - 2 copies of the executive design - 2 copies of the executive design - 2 copies of the executive design - 2 copies of the executive design - 2 copies of the executive design - 2 copies of the executive design - 2 copies of the executive design - 2 copies of the executive design - 2 copies of the executive design - 2 copies of the executive design - 2 copies of the executive design - 2 copies of the executive design - 2 copies of the executive design - 2 copies of the executive design - 2 copies of the executive design. The surface reconstruction project must be agreed with the road manager with the exact scope of the necessary surface to be reconstructed (m2) and with a division into its types, i.e.: asphalt, cobblestone, tile surface, etc.;2) electronic version on an electronic medium containing the following documentation: consisting of: a) non-editable documentation consisting of files with complete documentation, the content reflecting the paper version;b) non-editable version of the files (PDF) for the above mentioned above. the documentation should be made in the following way: - after approval of the design documentation by the competent building administration body (with appropriate clauses) it should be scanned,- PDF files should be created on the basis of editable files, scanned paper documents that were only in paper version or from files that were already PDF documents (decisions, statements, agreements, drawings, attestations, approvals, protocols, instructions, etc.).The content of the PDF file must be legible, scanned in an appropriate sharpness, the readability of stamps and signatures must be taken into account; c) the editable version of the project documentation should be prepared in accordance with the following division: - cost part (investor's cost estimate, summary cost statement) - *.ath and *.xml files for the cost estimate, *.doc(x) and *.xls(x) for ZZKNNośnik, provided to the Ordering Party, cannot be protected against copying; d) the medium must be described in a permanent and legible manner (e.g. by means of prints, stickers, technology allowing for burning subtitles or images on discs, etc.).After the approval of the design documentation by the competent authority of the building administration (with appropriate clauses) it must be scanned,- full name of the task,- number of the task contract with the date of signing the contract,- name of the documentation contractor,- month and year of the documentation development,- number of the next version and date of modification.
- Opportunity closing date
- 13 August 2020
- Value of contract
- to be confirmed
About the buyer
- Address
- Polska Spółka Gazownictwa sp. z o.o., Oddział Zakład Gazowniczy w Bydgoszczy ul. Jagiellońska 42 Bydgoszcz 85-097 Poland
- Contact
- edyta.czerniejewska@psgaz.pl
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.