Poland - Engineering design services

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
18 December 2019
Opportunity publication date
05 November 2019
Category
71320000: Engineering design services
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Preparation of project and formal and legal documentation related to the implementation of the task: "Rebuilding of the s/c gas grid with connections in the city centre. Trzebalnia - Trzebownia - Zaczernie, połączenie - Stage I" according to technical conditions no. PSGJA.ZMSZ.763A.260.767775.1.18 dated 28.11.2018. The indicative gas pipeline route is defined by a map attached to the technical conditions. The subject matter of the contract includes, among others: 1. Obtaining extracts and extracts from the land register of the real estate on which the planned gas pipeline with accompanying infrastructure will be located; 2. Preparing maps for design purposes; 3. Obtaining extracts from the Local Spatial Development Plan or, if there is no such plan, obtaining for the Contracting Authority a decision on determining the location of a public purpose investment;4. Obtaining permissions of all property owners (or persons legally sanctioned to dispose of the property) to enter the area and permanently occupy the property for the purposes of the investment together with permission for the necessary felling of trees and bushes;5. Developing a construction project or land development project together with a technical description for the submission of works that do not require a building permit decision.6Before submitting the documentation for the coordination meeting (if necessary), the location of the route of gas pipelines, dam and spline systems should be agreed in a territorially appropriate Gas Plant;8. Obtaining all required opinions, operators, agreements and decisions, including at the coordination meeting, necessary to obtain a valid building permit or a valid remodeling notification;9. Obtaining a valid building permit or notification for and on behalf of the Contracting Authority;10. Developing a high greenery inventory in required cases together with obtaining a permit for the removal of trees or bushes;11. Preparation of a detailed breakdown of the distribution network by diameter and length;12. Reporting on the progress of works in accordance with the contract concluded. Preparation of project and formal and legal documentation related to the implementation of the task: "Conversion of the gas grid and n/c connections to s/c in the city centre. Trzebrzebalnia - Zczernie, Połączenie - Stage II" in accordance with technical specifications no. PSGJA.ZMSZ.763A.266.768448.1.18 of 12.12.2018. An indicative gas pipeline route is defined by a map attached to the technical conditions; the subject matter of the contract includes, among others: 1. Obtaining extracts and extracts from the land register of the real estate on which the planned gas pipeline with accompanying infrastructure will be located; 2. Preparing maps for design purposes; 3. Obtaining extracts from the Local Spatial Development Plan or, if there is no such plan, obtaining for the Contracting Authority a decision on determining the location of a public purpose investment;4. Obtaining permissions of all property owners (or persons legally sanctioned to dispose of the property) to enter the area and permanently occupy the property for the purposes of the investment together with permission for the necessary felling of trees and bushes;5. Developing a construction project or land development project together with a technical description for the submission of works that do not require a building permit decision.6Before submitting the documentation for the coordination meeting (if necessary), the location of the route of gas pipelines, dam and relief systems should be agreed upon in the Gas Plant, as appropriate, in the territory of the Gas Plant.8Obtaining all required opinions, reports, agreements and decisions, including at the coordination meeting, necessary to obtain a valid building permit or a valid reconstruction notification;9. Obtaining a valid building permit or notification for and on behalf of the Contracting Authority;10. Preparing a high greenery inventory in required cases together with obtaining a permit for the removal of trees or bushes.11. Preparation of a detailed breakdown of the distribution network by diameter and length;12. Reporting on the progress of works in accordance with the contract concluded.

Opportunity closing date
18 December 2019
Value of contract
to be confirmed

About the buyer

Address
Polska Spółka Gazownictwa Sp. z o.o. Wojciecha Bandrowskiego 16 Tarnów 33-100 Poland
Contact
lukasz.zak@psgaz.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?