Poland - Engineering design services

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
28 June 2019
Opportunity publication date
17 June 2019
Category
71320000: Engineering design services
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Development of project documentation and author's supervision for the task entitled "Reconstruction of gas network s/c dn 40 PE 35 together with connections for gas pipeline s/c dn 110 PE 100 w m. Podłęże-Rudzica from building No. 263 to building No. 60.1. The Principal entrusts, and the Contractor undertakes to perform a construction and executive project "Reconstruction of gas network s/c dn 40 PE 35 together with connections for gas pipeline s/c dn 110 PE 100 w m. Podłęże-Rudzica" from construction No. 263 to construction No. 60 and perform author's supervision, which together will be the subject of the Agreement (Subject of the Agreement).2. The Contractor is obliged to familiarize himself with "General Terms and Conditions of Contracts Executed for Polska Spółka Gazownictwa Sp. z o.o.". dated 18.4.2019 (OWU), available on the Ordering Party's website at www.psgaz.pl, in the bookmark: For the Contractor / Downloads3. The subject of the Agreement covers in particular: 1) execution of a construction design, detailed design and pre-dimensional works: Execution of a project for reconstruction of the gas network s/c dn 40 PE 35 together with connections to the gas pipeline s/c dn 110 PE 100 w m. Podłęże-Rudzica from construction No. 263 to construction No. 60 according to technical conditions, sign: PSGKR.ZMSM.763.715471.1.18 of 30.10.2018 issued by the Polish Gas Company Sp. z o.o., Branch of Zakład Gazowniczy w Krakowie, hereinafter referred to as the Project,2) obtaining all required opinions, permits and decisions, including obtaining, in the name and on behalf of the Contracting Authority, from the competent authority, the final decision on the building permit,3) preparing investor's cost estimates,4) exercising author's supervision.4A detailed description of the subject of the Contract and the Contractor's obligations is included in the Description of the subject of the Order (Tender Specification) constituting Attachment No. 1 to the Contract and Technical Conditions No. PSGKR.ZMSM.763.715471.1.18 of 30.10.2018 constituting Attachment No. 2 to the Contract.5 Technical Data:1) type of object: medium pressure gas network2) location: Sub-base - Rudzica from the construction site 263 to the construction site. 603) network length: 110-1,142 mb, connection length: 40-14 mb, 32-51 mb, 25 mb-706 mb (the given length of the planned gas pipeline is an estimated number and may change in the event of changes in formal, legal and/or environmental conditions; the Ordering Party allows the length of the gas pipeline to be increased by 1.5% as part of the Contractor's remuneration); whereby: a) material of the gas pipelines: PE 100 RC SDR 17(17,6) type 2 connection material: PE 100 RC SDR 11 type 2,b) gas pipeline diameter: dn 110 - 1 142 mb,c) connection diameter: dn 40 - 14 mb, dn 32 - 51 mb, dn 25 mb - 706 mb,d) pressure: s/c

Opportunity closing date
28 June 2019
Value of contract
to be confirmed

About the buyer

Address
Polska Spółka Gazownictwa Sp. z o.o., Oddział Zakład Gazowniczy w Krakowie Gazowa 16 Kraków 31-060 Poland
Contact
lukasz.gudra@psgaz.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?