Description

Preparation of design and cost estimate documentation for the construction of a medium pressure gas network in Bydgoszcz, Suczyńska-Inwalidów Street.
Material scope:
- gas pipeline ś/c dn 450 PE L= 2 100,0 m,
- development of a traffic organisation design,
- the development of estimates of 25 units.
Detailed scope of work:
1) preparation of a detailed construction design, traffic organisation design, design for the reconstruction of the surface and pre-completion of works,
2) obtaining all required opinions, permits and decrees, including obtaining on behalf and on behalf of the Awarding Entity from the competent authority, the last one. a decision on a building permit or a notification,
3) wyk. wyk. kosztorychów inwestorskich (Investor's cost estimates),
4) supervising the author. including five one-off copyright supervision services,
5) registration of the construction logbook,
6) execution of the estimated Operators for the task in the number of 25 pcs.
The design document should consist of:
1) paper version consisting of:
a) construction design (without the documents included in point b) - 2 copies in paper form,
b) construction project (the formal part, i.e. the formal part, i.e. the consent, declaration, agreement of the owners of the plots through which the gas network runs, extracts from the land register) - 2 copies in paper form,
c) executive design - 3 copies in paper form,
d) excess of works - 1 copy in paper form,
e) investor's cost estimate - 1 copy in paper form,
f) traffic organisation project - 2 paper copies,
g) project of reconstructing the surface - 2 copies in paper form. The restoration project must be agreed with the road manager with the exact extent of the necessary surface area to be restored. (m2) and subdivided into its types, i.e.: asphalt, paving stones, tiles, etc. (m2) and into its types, i.e.: asphalt, cobblestones, tiles, etc. (m2),
h) estimation report - 3 copies in paper form;
2. electronic version on electronic medium containing the documentation: consisting of:
(a) a non-editable version of a document consisting of files containing a complete paper-based document,
b) non-editable version of files (PDF) for the above mentioned documentation shall be executed in the following manner:
- Once the design documentation has been approved by the competent building authority (with the relevant clauses), it should be scanned;
- PDF files should be created on the basis of editable files, scanned paper documents that were only in paper form or from files that were already pdf documents (decisions, statements, agreements, drawings, approvals, approvals, protocols, instructions, etc.);
- The PDF file cannot be protected against printing nor can it have any password;
- the content of the PDF file must be legible, scanned in appropriate sharpness, pay attention to the legibility of stamps and signatures.
NOTE: The formal part of the project documentation containing consents, statements, agreements of the owners of plots of land through which the gas network runs, excerpts from the land register, etc. must absolutely constitute a separate catalogue/file.
(c) the editable version of the design documentation shall be drawn up in accordance with the following subdivision:
- cost part (investor's cost estimate, collective cost statement) - files *.ath and *.xml for cost estimate, *.doc(x) and *.xls(x) for ZZKNośnik, transferred to the Ordering Party, cannot be protected against copying;
(d) the medium must be described in a permanent and legible manner (e.g. by printing, stickers, technology permitting the burning of inscriptions or images on discs, etc.) with the following particulars:
- Once the project document has been approved by the competent authority of the building administration (with the relevant clauses), it should be scanned,
- full name of the task,
- contract number and date of signing the contract,
- the name of the documentation contractor,
- month and year of preparation of the documentation,
- number of the next version and date of modification.
Execution of a design-cost estimate dock for the reconstruction of medium-pressure gas pipelines with a connection in Bydgoszcz, Przemysłowa Street, with author's supervision.
Material scope:
- gas pipeline ś/c A-B-C dn 225 PE L= 190,0 m,
- gas pipeline ś/c D-E-F dn 225 PE L= 180,0 m,
- gas pipeline ś/c G-H dn 180 PE L= 220,0 m,
- gas pipeline ś/c I-Jdn 180 PE L= 20,0 m,
- gas connection dn 32 PE L= 55 m pcs. 1 ul. Przemysłowa 23a dz. 4/9
- development of a traffic organisation design,
- development of estimated reports in the amount of 25 pcs.
Detailed scope of work:
1) graphic design of the executive design, design of traffic organisation, design of surface reconstruction and pre-commissioning of works,
2) obtaining all required opinions, permits and decrees, including obtaining on behalf of and for the benefit of
Contracting authority, from the competent authority, last. a decision on a building permit or a notification,
3) wyk. wyk. kosztorychów inwestorskich (Investor's cost estimates),
4) supervising the author. including five one-off copyright supervision services,
5) registration of the construction logbook.
6) execution of estimated reports 25 pcs.
The document should consist of:
1) paper version consisting of:
a) construction design (without documents included in point b) - 2 copies in the form of paper..,
b) construction project (the formal part, i.e. the formal part, i.e. the consent, statements, contracts of the owners of the plots through which the gas network runs, extracts from the land register) - 2 copies in the form of paper,
c) executive design - 3 copies in the form of paper..,
d) excess of works - 1 copy in the form of paper..,
e) investor's cost estimate - 1 copy in the form of a paper..,
f) traffic organisation design - 2 copies in the form of paper..,
g) project of reconstructing the surface - 2 copies in the form of paper. The design of the restoration of the surface must be agreed with the road manager with the exact extent of the necessary surface to be restored. (m2) and subdivided into its types, i.e.: asphalt, paving stones, tiles, etc. (m2) and into its types, i.e.: asphalt, cobblestones, tiles, etc. (m2),
h) estimation report - 3 copies in paper form;
2. the electronic version on the electronic medium containing the following document: consisting of
(a) A non-editable document consisting of files containing a complete paper-based document;
(b) the non-editable version of the files (PDF) for the abovementioned document shall be executed as follows:
- after approval of doc. draft by the competent authority of the building administration (with the appropriate
It should be scanned.
- PDF files should be created on the basis of editable files, scanned paper documents that were only in paper form or from files that were already PDF documents (decisions, statements, agreements, drawings, approvals, approvals, protocols, instructions, etc.).
- The PDF file cannot be protected against printing nor can it have any password.
- the content of the PDF file must be legible, scanned in appropriate sharpness, pay attention to the legibility of stamps and signatures.
NOTE: Formal part of the project document containing consents, statements, agreements of landowners
Through the area of which the gas network runs, extracts from the land register etc. absolutely must constitute a separate catalogue/file.
c) Editable version of the project documentation should be prepared in accordance with the following division:
- cost part (investor's cost estimate, collective cost statement) - files *.ath and *.xml for cost estimate, *.doc(x) and *.xls(x) for ZZKNośnik, transferred to the Ordering Party, cannot be protected against copying.
(d) The medium must be described in a permanent and legible manner (e.g. by printing, stickers, technologies, etc.).
Allows you to burn subtitles or images on discs, etc.) with the following data:
- after approval of the project document by the competent authority of the building administration (with the relevant documents).
It should be scanned,
- full name of the task,
- contract number and date of signing the contract,
- the name of the documentation contractor,
- month and year of preparation of the documentation,
- number of the next version and date of modification.

Opportunity closing date
18 July 2019
Value of contract
to be confirmed

About the buyer

Address
Polska Spółka Gazownictwa Sp. z o.o. Oddział Zakład Gazowniczy w Bydgoszczy Jagiellońska 42 Bydgoszcz 85-097 Poland
Contact
monika.zielinska@psgaz.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?