Poland - Engineering design services

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
03 September 2020
Opportunity publication date
03 August 2020
Category
71320000: En
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The subject of the order is the rebuilding of a DN 200 medium pressure steel pipeline of the Returned - Czerńczyce ratio to DN 250, consisting in the construction of an approx. 7 440 m of which:1) connection to active gas pipelines with stopped gas flow by applying the hermetic stopping method, or closing the gate valves on the nearest dam and outlet unit, but only with the consent and agreement of the Gas Stations and Network Section in Wałbrzych and using power supply from the LNG or CNG tanker to maintain continuity of gas supply in the direction of Ziębice;2) provide measurement points for corrosion protection; 3) surge the existing cathodic protection and prepare the possibility of connecting a new cathodic protection installation, which is prepared by a separate design study.Detailed technical requirements are specified in Appendix no. 2 to the agreement - Technical conditions no. PSGWR.ZMSZ.773.TWM-30.18.G update of 24.6.2020.

Opportunity closing date
03 September 2020
Value of contract
to be confirmed

About the buyer

Address
Polska Spółka Gazownictwa Sp. z o.o. ul. Wojciecha Bandrowskiego 16 Tarnów 33-100 Poland
Contact
przetargi.wroclaw@psgaz.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?