Poland - Engineering design services
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 03 September 2020
- Opportunity publication date
- 03 August 2020
- Category
- 71320000: En
- Value of contract
- to be confirmed
- Your guide to exporting
Description
The subject of the order is the rebuilding of a DN 200 medium pressure steel pipeline of the Returned - Czerńczyce ratio to DN 250, consisting in the construction of an approx. 7 440 m of which:1) connection to active gas pipelines with stopped gas flow by applying the hermetic stopping method, or closing the gate valves on the nearest dam and outlet unit, but only with the consent and agreement of the Gas Stations and Network Section in Wałbrzych and using power supply from the LNG or CNG tanker to maintain continuity of gas supply in the direction of Ziębice;2) provide measurement points for corrosion protection; 3) surge the existing cathodic protection and prepare the possibility of connecting a new cathodic protection installation, which is prepared by a separate design study.Detailed technical requirements are specified in Appendix no. 2 to the agreement - Technical conditions no. PSGWR.ZMSZ.773.TWM-30.18.G update of 24.6.2020.
- Opportunity closing date
- 03 September 2020
- Value of contract
- to be confirmed
About the buyer
- Address
- Polska Spółka Gazownictwa Sp. z o.o. ul. Wojciecha Bandrowskiego 16 Tarnów 33-100 Poland
- Contact
- przetargi.wroclaw@psgaz.pl
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.