Poland - Engineering design services

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
19 September 2019
Opportunity publication date
08 August 2019
Category
71320000: Engineering design services
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Preparation of project and formal and legal documentation related to the implementation of the task: "Construction of the section of the gas supply pipeline śr/c in Adamówka" in accordance with technical specifications no. PSGJA.ZMSZ.763A.142.906105.1.19 dated 03.07.2019. The indicative gas pipeline route is defined by a map attached to the technical conditions. The subject matter of the contract includes, among others: 1. Obtaining extracts and extracts from the land register of the real estate on which the planned gas pipeline will be located together with the accompanying infrastructure.2. Preparing maps for design purposes.3. Obtaining extracts from the Local Spatial Development Plan or, if there is no such plan, obtaining for the Contracting Authority a decision on determining the location of a public purpose investment4. Obtaining permissions of all property owners (or persons legally sanctioned to dispose of the property) to enter the area and permanently occupy the property for the purposes of the investment together with permission for the necessary felling of trees and bushes5. Before submitting the documentation for the coordination meeting, it is necessary to agree on the location of the route of gas pipelines, dam and relief systems in a territorially appropriate Gasworks.8 Obtaining all required opinions, operators, agreements and decisions, including at the coordination meeting, necessary to obtain a valid building permit or a valid remodeling notification.9Obtaining a valid building permit or notification for and on behalf of the Contracting Authority.10. Preparation of a high greenery inventory in required cases together with obtaining a permit to remove trees or shrubs.11. Preparation of a detailed breakdown of the distribution network by diameter and length.12. Reporting on the progress of works in accordance with the concluded agreement. Preparation of project and formal and legal documentation related to the implementation of the task: "In accordance with technical specifications no. PSGJA.ZMSZ.763A.145.906090.1.19 of 08.07.2019. The indicative gas pipeline route is defined by a map attached to the technical conditions. The subject matter of the contract includes, among others: 1. Obtaining extracts and extracts from the land register of the real estate on which the planned gas pipeline will be located together with the accompanying infrastructure.2. Preparing maps for design purposes.3. Obtaining extracts from the Local Spatial Development Plan or, if there is no such plan, obtaining for the Contracting Authority a decision on determining the location of a public purpose investment4. Obtaining permissions of all property owners (or persons legally sanctioned to dispose of the property) to enter the area and permanently occupy the property for the purposes of the investment together with permission for the necessary felling of trees and bushes5. Before submitting the documentation for the coordination meeting, it is necessary to agree on the location of the route of gas pipelines, dam and relief systems in a territorially appropriate Gasworks.8 Obtaining all required opinions, operators, agreements and decisions, including at the coordination meeting, necessary to obtain a valid building permit or a valid remodeling notification.9Obtaining a valid building permit or notification for and on behalf of the Contracting Authority.10. Preparation of a high greenery inventory in required cases together with obtaining a permit to remove trees or shrubs.11. Preparation of a detailed breakdown of the distribution network by diameter and length.12. Reporting on the progress of works in accordance with the concluded agreement.

Opportunity closing date
19 September 2019
Value of contract
to be confirmed

About the buyer

Address
Polska Spółka Gazownictwa Sp. z o.o Wojciecha Bandrowskiego 16 Tarnów 33-100 Poland
Contact
lukasz.zak@psgaz.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?