Poland - Engineering design services
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 19 September 2019
- Opportunity publication date
- 08 August 2019
- Category
- 71320000: Engineering design services
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Preparation of project and formal and legal documentation related to the implementation of the task: "Construction of the section of the gas supply pipeline śr/c in Adamówka" in accordance with technical specifications no. PSGJA.ZMSZ.763A.142.906105.1.19 dated 03.07.2019. The indicative gas pipeline route is defined by a map attached to the technical conditions. The subject matter of the contract includes, among others: 1. Obtaining extracts and extracts from the land register of the real estate on which the planned gas pipeline will be located together with the accompanying infrastructure.2. Preparing maps for design purposes.3. Obtaining extracts from the Local Spatial Development Plan or, if there is no such plan, obtaining for the Contracting Authority a decision on determining the location of a public purpose investment4. Obtaining permissions of all property owners (or persons legally sanctioned to dispose of the property) to enter the area and permanently occupy the property for the purposes of the investment together with permission for the necessary felling of trees and bushes5. Before submitting the documentation for the coordination meeting, it is necessary to agree on the location of the route of gas pipelines, dam and relief systems in a territorially appropriate Gasworks.8 Obtaining all required opinions, operators, agreements and decisions, including at the coordination meeting, necessary to obtain a valid building permit or a valid remodeling notification.9Obtaining a valid building permit or notification for and on behalf of the Contracting Authority.10. Preparation of a high greenery inventory in required cases together with obtaining a permit to remove trees or shrubs.11. Preparation of a detailed breakdown of the distribution network by diameter and length.12. Reporting on the progress of works in accordance with the concluded agreement. Preparation of project and formal and legal documentation related to the implementation of the task: "In accordance with technical specifications no. PSGJA.ZMSZ.763A.145.906090.1.19 of 08.07.2019. The indicative gas pipeline route is defined by a map attached to the technical conditions. The subject matter of the contract includes, among others: 1. Obtaining extracts and extracts from the land register of the real estate on which the planned gas pipeline will be located together with the accompanying infrastructure.2. Preparing maps for design purposes.3. Obtaining extracts from the Local Spatial Development Plan or, if there is no such plan, obtaining for the Contracting Authority a decision on determining the location of a public purpose investment4. Obtaining permissions of all property owners (or persons legally sanctioned to dispose of the property) to enter the area and permanently occupy the property for the purposes of the investment together with permission for the necessary felling of trees and bushes5. Before submitting the documentation for the coordination meeting, it is necessary to agree on the location of the route of gas pipelines, dam and relief systems in a territorially appropriate Gasworks.8 Obtaining all required opinions, operators, agreements and decisions, including at the coordination meeting, necessary to obtain a valid building permit or a valid remodeling notification.9Obtaining a valid building permit or notification for and on behalf of the Contracting Authority.10. Preparation of a high greenery inventory in required cases together with obtaining a permit to remove trees or shrubs.11. Preparation of a detailed breakdown of the distribution network by diameter and length.12. Reporting on the progress of works in accordance with the concluded agreement.
- Opportunity closing date
- 19 September 2019
- Value of contract
- to be confirmed
About the buyer
- Address
- Polska Spółka Gazownictwa Sp. z o.o Wojciecha Bandrowskiego 16 Tarnów 33-100 Poland
- Contact
- lukasz.zak@psgaz.pl
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.