Poland - Engineering design services
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 23 October 2020
- Opportunity publication date
- 16 September 2020
- Category
- 71320000: En
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Development of project documentation - stage: Technical-Economic-Environmental Study with elements of the Programme Concept together with obtaining - on behalf and for the benefit of the investor - the decision on environmental conditions for the task: Construction of the Starachowice bypass within DK 42 and with giving answers at the stage of the tender procedure for the selection of the contractor in the system design and build.
The planned investment is located in Świętokrzyskie voivodship, Starachowice district, in the commune: The subject of the task is the construction of a GP class road of about 15.00 km in length. 1x2 GP cross-section was initially assumed, but at the stage of design works the forecast and traffic analysis may show the necessity of using 2x2 GP cross-section on the whole length of the designed section or its part.Basic investment objectives:- construction of a GP class road along a new track of about 15.00 km,- construction of a road junction on the planned Wąchocka bypass and the planned Starachowice bypass,- construction of one-level crossings enabling the bypass to connect the existing DK 42 with city streets, including access to the Special Economic Zone, with the voivodship road DW 744, county and commune roads and inclusion in the existing DK 9 or 42,- construction of additional roads to serve adjacent areas or construction/construction of other public roads,- construction of engineering facilities: overpasses, viaducts, a bridge, animal crossings, culverts (some of the facilities will also serve as animal crossings),- construction of pavement sections and a pedestrian and bicycle route,- construction/ reconstruction of bus bays with bay accesses, pedestrian crossings,- construction of environmental protection facilities,- construction of safety and traffic organization elements, - construction of road drainage, - construction of stormwater drainage, - construction of technological sewers, - construction / reconstruction of street lighting, - construction / reconstruction of the existing technical infrastructure necessary for the implementation of the investment or colliding with its implementation, - conducting transit traffic in the directions: east-west outside the area of dense residential development, - increasing the capacity and speed of transit traffic, - improving traffic safety on national roads, reducing accidents, - reducing emissions and noise, - improving the accessibility of urban centers, including areas particularly important for the economic development of the region.
- Opportunity closing date
- 23 October 2020
- Value of contract
- to be confirmed
About the buyer
- Address
- Generalna Dyrekcja Dróg Krajowych i Autostrad, ul. Wronia 53, 00-874 Warszawa, prowadzący postępowanie: Generalna Dyrekcja Dróg Krajowych i Autostrad, Oddział w Kielcach ul. Paderewskiego 43/45 Kielce 25-950 Poland
- Contact
- sekretariat_kielce@gddkia.gov.pl
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.