Poland - Engineering design services

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
21 August 2019
Opportunity publication date
11 July 2019
Category
71320000: Engineering design services
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Development of a formal and legal design document together with obtaining the final decision on the building permit (construction design) and technical design (executive design), as well as performing author's supervision over the Investment for the project under the name: Construction of gas pipelines ś/c in the city of Łubianka, Pigża, Świerczynki, for the following scope of activities.Scope of activities: Gas pipelines of 1st class location: Gas pipeline ś/c dn 160 PE o dług. L= approx. 1,430.00 mGas pipeline ś/c dn 125 PE long. L= approx. 6 300,00 mGas pipeline ś/c dn 90 PE with debt. L= approx. 930.00 mGazociągi o II Class location:Gazociągi ś/c dnn. 110 PE o dług. L= approx. 1 265.00 m.  The gas pipeline ś/c dn 90 PE with debt. L= approx. 2,740.00 mGas pipeline ś/c dn 63 PE with debt. L= approx. 8 500.00 mGazociągi o III klasy lokalizacjiGazociągu ś/c dn 160 PE o dług.L= approx. 1 000,00 mDetailed scope of works: 1) design of the construction design, traffic organisation design, design of the reconstruction of the Surface and the size of the works,2) obtaining all required opinions, permits and decisions, including obtaining the final decision on the construction permit on behalf and for the Contracting Authority, from the competent authority,3) design of the construction permit, 4) design of the gas pipeline, 5) obtaining the final decision on the construction permit for the Contracting Authority, 4) design of the construction permit for the gas pipeline, 5) obtaining the final decision on the construction permit for the Contracting Authority's behalf and for the Contracting Authority's benefit. Investor cost estimates,4) author's supervision cases covering five one-off author's supervision services,5) registration of the construction logbook.the Design Document should be composed of: 1) the paper version consisting of: a) the design of the construction site, b) the design of the construction site, c) the design of the construction site, d) the design of the construction site, d) the design of the construction site, e) the design of the construction site, f) the design of the construction site. (without documents included in point b) - 2 copies in the form of paper, b) construction design (formal part, i.e. the formal part, i.e. the consent, declaration, agreement of the owners of the plots through which the gas network runs, extracts from the land register) - 2 copies in the form of paper..,c) executive design - 3 copies in the form of paper, d) pre-completion of works - 1 copy in the form of paper, e) investor's cost estimate - 1 copy in the form of paper, f) traffic organisation design - 2 copies in the form of paper, g) surface restoration design - 2 copies in the form of paper. The road surface reconstruction design must be agreed with the road manager with the exact scope of the necessary area for reconstruction (m2) and divided into its types, i.e.: asphalt, paving stones, tile surface, etc.,2) Electronic version on an electric carrier containing doc, the content reflecting the paper version.;b) Non-editable version of files (PDF) for the above mentioned documents should be made in the following way: - After the design document is approved by the competent building administration authority (with appropriate clauses), it should be scanned.- PDF files should be created on the basis of editable files, scanned doc. The PDF file cannot be protected against printing nor can it have any password.- The content of the PDF file must be legible, scanned in appropriate sharpness, pay attention to the legibility of stamps and signatures.Note: The formal part of the design document containing the consents, states.., The editable version of doc.i proj. should be prepared in accordance with the following division: - cost part (investor's cost estimate, collective cost statement) - files *.ath and *.xml for cost estimate, *.doc(x) and *.xls(x) for ZZK. The medium, handed over to the Ordering Party, cannot be protected against copying; d) The medium must be described in a permanent and legible way (e.g. by means of overprints, stickers, technology allowing to burn inscriptions or images on discs, etc.) with the following data:- After approval of the design by the competent authority of the Bud. Full name of the task - Contractor's contract number with the date of signing the contract - Contractor's name document.- Month and year of preparation - Next version number and date of modification.

Opportunity closing date
21 August 2019
Value of contract
to be confirmed

About the buyer

Address
Polska Spółka Gazownictwa Sp. z o.o., Oddział Zakład Gazowniczy w Bydgoszczy Jagiellońska 42 Bydgoszcz 85-097 Poland
Contact
monika.zielinska@psgaz.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?