Germany - Engineering and building construction works

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
22 October 2021
Opportunity publication date
29 September 2021
Category
45220000: En
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Construction work for the new construction of the U5 East in the northeastern city area of the Free and Hanseatic City of Hamburg. Construction of a construction site installation area for the subsequent tunnel construction. Replacement of a pedestrian bridge with a temporary auxiliary bridge. Up to the approval planning and the submission of the building application plus the implementation planning, the services were provided by a planning office commissioned by HOCHBAHN. The implementation plans are attached to the invitation to tender and are to be taken into account when preparing the offer.
New construction of the U5 East:Production of construction site equipment areas in the course of the new construction of the U5 East:- approx. 80 thousand cubic metres of excavated soil, transport and disposal- approx. 1,800 sqm of steel sheet piling to be pressed in (no delivery)- approx. 3,400 sqm of steel sheet piling to be installed with low vibration (no delivery)- approx. 145 cubic metres of concrete to be used for the head beam- approx. 1,140 cubic metres of prefabricated concrete elements to be delivered and installed as an angled retaining wall- approx. 265 pcs. grouted anchors - approx. 3600 sqm construction roads supply and manufactureConstruction of a replacement Paul-Stritter bridge: clear width approx. 35.80, width between the railings: 4.00mConstruction type: WL: concrete and sheet pile wall construction, superstructure VFT girder in composite construction- approx. 38 to steel structure of the existing superstructure demolish- approx. 120 cbm concrete of the existing abutments demolish- 1 pc. Supply and install one temporary bridge, approx. 52 m long, with a clear width between the railings of 2.50 m and a total width of approx. 3.1 m- Supply and install approx. 175 cbm of structural concrete for abutments- Approx. 355 sqm of sheet pile construction for abutments, incl. supply and installation- Approx. 22 to VFT steel girder superstructure supply and installation- Approx. 16 cbm prefabricated concrete parts for superstructure on VFT girder and mastic asphalt sealing- railing and equipment worksrailway construction stop Sengelmannstraße- approx. 450 m track back and front construction, tamping and welding works- approx. 1800 sqm substructure construction- approx. 400 running m cable duct works- approx. 400m conductor rail dismantle and build up

Opportunity closing date
22 October 2021
Value of contract
to be confirmed

About the buyer

Address
Hamburger Hochbahn AG Steinstraße 20 Hamburg 20095 Germany
Contact
rafael.krause@hochbahn.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?