Poland - Electricity, heat, solar and nuclear energy

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
21 October 2019
Opportunity publication date
18 September 2019
Category
9300000: Electricity, heating, solar and nuclear energy
Value of contract
£1m-5m
Your guide to exporting
Report opportunity

Description

The subject of the contract is a comprehensive supply of electricity within 24 months, including the sale of electricity and the provision of electricity distribution services through the distribution network belonging to the distribution system operator to the following points of receipt (facilities) of Centralna Pompowni "Bolko" Sp. z o.o. z o.o. in Bytom: a) main plant of the Central Pumping Station "Bolko" at 4 Kruszcowa Street in Bytom, b) mine water purification station at Lotników Street in Piekary Śląskich (Brzozowice Kamień).2. A detailed description of the subject of the contract is attached as Appendix 1 to the ToR.3.The estimated amount of electricity that will be supplied annually during the term of the agreement to individual facilities is: a) the main plant of the Central Pumping Station "Bolko" - the current tariff group B 23; maximum annual demand in the period 2007-2018: 16 210 MWh; average annual demand in the period 2007-2018: 9 746,09 MWh; contracted capacity 2 800 kW: capacity at 20 power stage: 2 800 kW;b) Mine Water Treatment Station - former tariff group C 21; maximum annual demand in the period 2007-2018: 77.20 MWh; average annual demand for the period 2007-2018: 63.14 MWh, contracted capacity: (c) the specific electricity consumption for the period 2007-2018 is shown in the table below: l.p. year ZG CP Bolko SOWK1 2007 10068,0 53,1 MWh2 2008 8657,3 77,2 MWh3 2009 10706,8 70,2 MWh4 2010 16210,1 62,2 MWh5 2011 12819,8 69,7 MWh6 2012 9469,2 68,7 MWh7 2013 10333,6 67,4 MWh8 2014 8298,2 68,9 MWh9 2015 7685,3 69,5 MWh10 2016 7339,315 47,212 MWh11 2017 7718,771 49,449 MWh12 2018 7646,741 54,12 MWh Average 9746,09 63,14 MWh4. The planned energy consumption figures shall be estimates and shall not reflect the actual or declared use of electricity during the term of the contract, nor shall they constitute an obligation on the part of the Purchaser to purchase energy in the specified quantity and shall in no case give rise to any claims on the part of the Contractor. The actual amount of energy purchased during the performance of the contract, confirmed by the indications of the metering and settlement system, will result exclusively from the current needs of the Contracting Authority, and the unit prices specified in the tender form will be binding for the Contractor regardless of the actual consumption.

Opportunity closing date
21 October 2019
Value of contract
£1m-5m

About the buyer

Address
Centralna Pompownia „Bolko” Sp. z o.o. ul. Kruszcowa 4 Bytom 41-902 Poland
Contact
cpbolko@cpbolko.nazwa.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?