Germany - demolition works
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 23 January 2020
- Opportunity publication date
- 22 November 2019
- Category
- 45111100: Demolition work
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Demolition work - construction site equipment 1.00 pcs working platforms, mobile scaffolding, inside 4.00 pcs,- Building protection walls 62.00 sqm, - screeds break off, dispose 83.00 sqm, - Bachstein, Wacken remove, dispose 97.00 sqm, - tiles remove, dispose 829.00 sqm, - PVC, linoleum, carpet floors remove, dispose 25.00 sqm, - ETICS inside, remove, dispose 21,00 sqm, - inside walls remove brickwork, dispose 55,15 cbm, - facing shells gas concrete remove, dispose 202,00 sqm, - wall tiles remove, dispose 184,00 sqm, - window remove, dispose 23,00 pc.,- Remove doors, dispose of 37.00 pcs,- Dismantle window sills and scuff boards, dispose of 50.00 m, freight elevator, disassemble and dispose of, two stops 1.00 pcs., kitchen equipment parts, disassemble stainless steel, dispose of 23.00 pcs., seat benches, disassemble dining rooms, dispose of 100.00 m, cabinets, etc., dispose of 25.00 pcs., WC partitions, disassemble 27.00 sqm, sanitary facilities, dispose of 59.00 pcs,- Core drillings different diameters and lengths 50.00 pc., - concrete saw cuts different depths and lengths 30.00 rpm hourly rates 170.00 hrs - HLS disassemble, dispose of water pipes 290.00 m - HLS disassemble, dispose of ground pipes 195.00 m - HLS disassemble, dispose of floor drains 5.00 pc,- HLS Water pipes disassembly, disposal 1 150.00 m, - HLS Sanitary objects disassembly, disposal 42.00 HLS Heating pipes with insulation disassembly, disposal 2 045.00 m, - HLS Radiators/convectors/heating plates disassembly, disposal 47.00 HLS Radiators/convectors/heating plates disassembly, disposal 47.00- HLS asbestos-containing seals disassemble, dispose of 50.00 HLS ventilation ducts/pipes disassemble, dispose of 70.00 m - HLS insulation (KMF) disassemble, dispose of 40.00 qm - HLS exhaust air devices etc. disassemble, dispose of 8.00 HLS fire dampers etc. disassemble, dispose of 6.00 HLS fire dampers etc,- HLS Ventilation/weather protection grille etc. disassemble, dispose of 40.00 HLS Hourly rates 70.00 hrs,- ELT cable (Cu, aluminium).disassemble, dispose 500,00 Kg,- ELT laying systems, empty conduits, cable ducts disassemble, dispose 300,00 Kg,- ELT laying systems, empty conduits disassemble, dispose 100,00 Kg,- ELT switch cabinets disassemble, dispose 650,00 Kg,- ELT lights, fluorescent tubes disassemble, dispose 270,00 Kg,- ELT lights, disassemble dangerous substances disassemble, dispose 25,00 Kg,- ELT Inst.Material Disassemble terminal/connection boxes, dispose of 110.00 kg.
- Opportunity closing date
- 23 January 2020
- Value of contract
- to be confirmed
About the buyer
- Address
- Deutsche Provinz der Salesianer Don Boscos St. -Wolfgangs-Platz 10 München 81669 Germany
- Contact
- benediktbeuern@hitzler-ingenieure.de
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.