Germany - demolition works

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
24 October 2019
Opportunity publication date
03 October 2019
Category
45111100: Demolition work
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

1) 4 500 m dismantling of pipelines with KMF insulation DN 10 -125;2) 70 m dismantling of drainage pipes. SML+HT pipes with KMF insulation DN 10 -125;3) 450 m dismantling of refrigeration pipes with soft foam insulation DN 15 -100;4) 550 m dismantling of drainage pipes SML + HT without insulation DN 50 -125;5) 420 m dismantling of pipes without insulation DN 10 -65;6) 50 m dismantling of liquid gas pipes DN 100 - 125;7) 50 pcs. sanitary equipment;8) 1 pc. Disassembly refrigerating machine water-cooled; approx. 230 kW with control station, expansion tank, buffer tank;9) 1 pc. Disassembly cold water distributor 200/200 with 7 connection pieces L= approx. 3 m;10) 3 pcs. disassembly WRG-KVS - control station, pump piping with ISO;11) 2 pcs. disassembly drinking water distributor connection DN 80; L approx. 7,5 m;12) 1 pc. Dismantling water treatment plant osmosis plant, tank with 1 000 l; pressure boosting plant; disinfection bandage, UV disinfection, distributor and stainless steel + plastic piping + switch cabinet. dim.: approx. 2.20 x 5.00 x 2.00 m;13) 1 pc. Dismantling box unit exhaust air 28 000 m3/h, removal from central roof unit incl. crane position;14) 1 pc. Dismantling box unit supply air 28 000 m³/h, removal from ventilation centre GG (UG) incl. unit dismantling and removal;15) 1 pc. Dismantling box unit supply and exhaust air 26 500 m³/h each, removal from ventilation centre 2nd floor incl. dismantling of units and removal via construction hoist;16) 1 pc. Disassembly of box units supply and return air 21,000 m³/h each, removal from ventilation centre GG (UG) incl. unit disassembly and removal;17) 7 pcs. Disassembly of supply and return air box units (small units) up to approx. WxH = approx. 1.0 x 1.0 m;18) 3 pcs. Disassembly of pipe fan DN 100;19) 13 pcs. Dismantling duct air heater;20) 205 m2 Dismantling rectangular ducts without Iso;21) 660 m2 Dismantling rectangular ducts with ISO KMF;22) 400 m2 Dismantling KMF-ISO around rectangular ducts;23) 360 m Dismantling round duct ventilation ducts DN 100 to 400 without Iso;24) 460 m Dismantling round duct ventilation ducts DN 100 to 400 with ISO KMF;25) 230 m Dismantling KMF-ISO around round duct ventilation ducts DN 100 to 400;26) 40 pcs. Volume flow controller DN 100 to DN 300 incl. pipe SD;27) 95 pcs. Dismantling disc valves + swirl diffusers;28) 50 pcs. Dismantling of BSKs containing asbestos incl. chiselling + measures according to TRGS 519;29) 25 pcs. Disassembly of splitter silencer.

Opportunity closing date
24 October 2019
Value of contract
to be confirmed

About the buyer

Address
VPL Plochingen – Verwaltungsstandort-Außenstelle LRA Esslingen – BA 8-12 Am Aussichtsturm 5 Plochingen 73207 Germany
Contact
j.birkl@psb-wasner.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?