Poland - Construction work for water and sewage pipelines Construction work for water and sewage pipelines

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
21 October 2019
Opportunity publication date
13 September 2019
Category
45231300: Construction work for water and sewage pipelines
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The scope of the contract covers the following tasks: A) TASK 1 - PĘPOWO - Reconstruction and construction of a sanitary sewage system through the Department of Health and Welfare of the Republic of Poland, the Ministry of Health, the Ministry of Health, the Ministry of Health, the Ministry of the Environment, the Ministry of Health, the Ministry of the Environment, the Ministry of the Environment, the Ministry of the Environment, the Ministry of Regional Development, the Ministry of the Environment, the Ministry of Regional Development, the Ministry of the Environment, the Ministry of Regional Development, the Ministry of Regional Development and the Ministry of Regional Development.nr 7, 63/1, 64/26, 64/47, 64,57, 64/55, 65/54, 65/53, 65/46, 65/47, 65/36, 65/35, 65/52, 65/78, 65/19, 65/22, 65/12, 66, 59/2, 43/14, 3/1, 57/4, 55 in Pępów, Świerkowa, Modrzewiowa, Lipowa, Gdańska, Armii Krajowej, gm. Zhukovo embracing:1) construction of a sanitary sewage system made of DN 200 class S PVC pipes - approx. 1178 mb;2) construction of a sanitary sewage system made of DN 225x12.8 SDR17 pipes - approx. 56.4 mb;3) construction of a sanitary sewer in section S1-S9 and S12-S15 of vitrified clay pipes DN250 by the open trench method - approx. 260.6 m (S12-S15 in a steel protective pipe - jacking)4) construction of a sanitary sewer in section S9-12 of vitrified clay pipes DN250 by the drilling method - approx. 108,9 mb5) construction of sanitary sewage system on the section S12-S14 made of vitrified clay pipes DN200 by drilling - approx. 35.3 mb6) execution of PVC ducts DN 160 to the border of plots in accordance with the documentation7) installation of protective pipes in accordance with the documentation8) reconstruction of the area after the works in accordance with the documentation9) execution and agreement on the project of temporary organization of trafficB. Task 2 - PĘPOWO - Construction of a sanitary sewage system in dz. nr 45/58, 45/62, 55 in the area of Słoneczne Tarasy and Armii Krajowej Street, including: 1) construction of a sanitary sewage system DN200 - approx. 148.3 mb;2) liquidation of a sewage system in accordance with the documentation3) PVC ducts DN 160 to the border of plots in accordance with the documentation4) installation of protective pipes in accordance with the documentation5) reconstruction of the area after the works in accordance with the documentation6) execution and agreement on a temporary traffic organization project. TASK 3 - PĘPOWO - Construction of a sanitary sewage system in the area of Gdańska, Lipowa, Staszica, Chłopska, Górna and adjacent streets including:1) Execution of pressure sewer) Pressure pipeline Ø 90PE-RC open excavation - approx. 994,6 m) Pressure pipeline Ø 90PE-RC trenchless - approx. 93,0m2) Execution of gravity sewerage: a) Gravity sewer network Ø250 jacking stoneware - approx. 1,389.7 mb) Gravity sewerage system Ø200 jacking stoneware - approx. 2,149.3 mc) Gravity sewerage system Ø200PVC - approx. 11,268.70 md) Gravity sewerage system Ø250PVC - approx. 501.9 m) Gravity sewerage system DN200PP trenchless - approx. 558.5 mf) Reconstruction of the network along the Ø200PVC route - approx. 170.1 mg) Reconstruction of connections along the Ø160PVC route - approx. 57.2 mh) Blinded sections of the Ø160PVC gravity sewer - approx. 2 140.70 m) Blinded sections of the Ø150 gravity sewer system - approx. 482.3 mj) Ø200PVC connection - approx. 201,3 mk) Wastewater pumping station with land development, water supply and electrical connection and division of plots with separation of a new plot number - 3 pcs.l) Modernisation of the wastewater pumping station located in plot No. 81/7, Pępowo districtThe designed shelter should provide lighting over the unit and lead the flue pipe over the shelter roof. Between the pumping station tank and the last well, insert an additional well with a 1.0 m settling tank as shown in Fig. 18 - Diagram of a well with a settling tank Dn1200.3) Execution of a water supply system: a) Water supply connection Ø40 PE - approx. 131.8 m

Opportunity closing date
21 October 2019
Value of contract
to be confirmed

About the buyer

Address
Spółka Komunalna Żukowo Sp. z o.o. ul. Pod Otomino 44 Żukowo 83-330 Poland
Contact
m.sirocki@skzukowo.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?