Germany - Construction work for water and sewage pipelines

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
19 June 2019
Opportunity publication date
07 June 2019
Category
45231300: Construction work for water and sewage pipelines
Value of contract
£5m-50m
Your guide to exporting
Report opportunity

Description

Lot 9: Construction phase I: Pipeline construction Schweinfurt waterworks to Weyer exit Weyer/ Weyer exit Weyer waterworks: Laying of drinking water transport line using flushing, ploughing, pressing and milling methods as well as open construction method, as steel pipe with external protection made of PE coating and internal protection made of cement mortar lining, total length approx. 10 200 m, of which approx. 9 100 m DN 400, approx. 1 100 m DN 300; parallel installation of cable conduit 3 x DA 180, total length approx. 4 700 m; installation of micro cable conduit approx. 1 000 m. Other CPV codes: 45231000; 45231100; 45231110; 45232000. Place of performance: NUTS codes: DE262, DE26B. Main place of execution: Schweinfurt (independent town) - Weyer (district of Schweinfurt) "Please note": Further conditions of participation, technical and professional capacity: I. Information on competence: Statement on qualifications welder/welding supervisor; test certificates (welder according to DIN EN ISO 9606 (steel pipe); welder according to DVGW GW 330 (PE pipe); welder according to DVGW GW 15 (steel pipe post-coating); welding supervisor according to DVGW GW 350 (steel pipe); welding supervisor according to DVGW GW 331 (PE pipe); qualification for pipe laying: Certification for pipe installation according to DVGW GW 301 - Group W1, each with at least the certificates for steel pipe installation (St) and PE pipe installation (PE). Cf. further requirements III.1.3) of the Announcement and IV Forms for the Application for Participation (TNA). II. minimum requirements (MA), each of which must be met by only one reference to lot 9, i.e. TNA will only be taken into account if each MA is met by at least one of the references, but the various MA do not have to be met by the same reference: Installation of a drinking water pressure pipe made of steel pipe with at least DN 400, group W1, length at least 1,000 m; installation of a steel or PE pipe using the controlled trenchless ploughing method, without unscheduled height points, permanent monitoring of the position and installation depth (XYZ axis) in real time, including documentation and measurement protocol; drilling presses, steel protection pipes with at least DN 500; flushing drilling with at least DN 400, length at least 50 m; installation of a drinking water pressure pipe which was put into permanent operation during the period 2013-2019. Cf. further MA No. III.1.3) of the Announcement and No. VI Forms for the Application to Participate. Lot 10, construction phase II: Pipeline construction, Weyer exit to Horhausen waterworks: Laying of drinking water transport line using flushing, ploughing and milling methods as well as open construction method, total length approx. 7 100 m DN 300; laying of micro-cable pipe composite approx. 200 m. Other CPV codes: 45231000; 45231100; 45231110; 45232000. Place of performance: NUTS codes: DE267; DE26B. Main place of execution: Weyer (district Schweinfurt) - Horhausen (district Hassberge). "Please note*: Other conditions of participation, technical and professional capacity: (I) Information concerning competence: Statement on qualifications welder/welding supervisor; test certificates (welder according to DIN EN ISO 9606 (steel pipe); welder according to DVGW GW 330 (PE pipe); welder according to DVGW GW 15 (steel pipe recoating); welding supervisor according to DVGW GW 350 (steel pipe); Welding supervision according to DVGW GW 331 (PE pipe); qualification for pipe installation (certification for pipe installation according to DVGW GW 301 - group W2, each with at least the certificates for steel pipe installation (St) and PE pipe installation (PE)). Cf. further requirements III.1.3) of the Announcement and IV Forms for the Application to Participate (TNA); II) Minimum Requirements (MA), each of which must only be fulfilled by a reference to Lot 9 10, i.e. TNA will only be taken into account if each MA is fulfilled by at least one of the references, but the various MA must not be fulfilled by the same reference: Installation of a drinking water pressure pipeline made of steel pipe with at least DN 300, group W2, length at least 1 000 m; installation in controlled trenchless ploughing method, without unscheduled height points, permanent monitoring of the location and installation depth (XYZ axis) in real time, including documentation and measurement protocol; flushing drilling with at least DN 300, length at least 50 m; installation of a drinking water pressure pipeline which was taken into permanent operation in the period 2013-2019. Cf. further MA No. III.1.3) of the Announcement and No. VI Forms for the Application to Participate. Lot 11, construction phase III: Pipeline construction Horhausen waterworks to Wohnau connection with delivery shaft Steam compartment: Laying of drinking water transport line using flushing, pressing and milling methods as well as open construction method, total length approx. 6,900 m DN 250; laying of micro-cable pipe network approx. 6,900 m; construction of delivery shaft made of precast reinforced concrete. Other CPV codes:; 45231000; 45231100; 45231110; 45232000. Place of performance: NUTS code: DE267. Main place of execution: Horhausen - Wohnau (district Hassberge) "Please note": Other conditions for participation; Technical and professional capacity: I. Information on competence: Statement on qualifications welder/welding supervisor; test certificates (welder according to DINEN ISO 9606 (steel pipe); welder according to DVGW GW 330 (PE pipe); welder according to DVGW GW 15 (steel pipe recoating); welding supervisor according to DVGW GW 350 (steel pipe); Welding supervision according to DVGWGW 331 (PE pipe); qualification for pipe installation (certification for pipe installation according to DVGW GW 301 -group W3, each with at least d certificates for steel pipe installation (St) and PE pipe installation (PE)). See also III.1.3) of the Announcement and VI Forms for the Application to Participate (TNA). II. minimum requirements (MA), each of which only needs to be met by a reference to lot 9 11, i.e. TNA will only be taken into account if each MA is met by at least one of the references, but the different MA do not need to be met by the same reference: Installation of a drinking water pressure pipeline made of steel pipe, group W3, length at least 1 000 m; drilling presses, steel protection pipes with at least DN 400; flushing drilling with at least DN 250, length at least 50 m; installation of a drinking water pressure pipeline, which was taken into permanent operation in the period 2013-2019. Cf. further MA No. III.1.3) of the Announcement and No. VI Forms for the Application to Participate.

Opportunity closing date
19 June 2019
Value of contract
£5m-50m

About the buyer

Address
Stadtwerke Schweinfurt GmbH Bodelschwinghstraße 1 Schweinfurt 97421 Germany
Contact
w.renner@heuking.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?