Poland - Construction work for water and sewage pipelines
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 07 September 2020
- Opportunity publication date
- 04 August 2020
- Category
- 45231300: Co
- Value of contract
- to be confirmed
- Your guide to exporting
Description
The subject of the contract is the construction of a sanitary sewage system in Miszewo, Miszewko, Dąbrowa and Banino on the territory of Żukowo Commune. 2: Miszewo, Miszewko, Dąbrowa and Banino with fragments of connections from the network to the boundaries of private plots of land, hereinafter referred to as connections, the pumping system with four pumping stations and accompanying infrastructure.3. A detailed description of the order is contained in Chapter III of the ToR.4. The subject matter of the order is carried out under the project "Water and sewage management in Żukowo Municipality - Stage I". co-financed by the European Union under the Operational Programme Infrastructure and Environment 2014-2020 - Measure 2.3.
The subject of the contract covers the following tasks:1) Execution of the pressure sewer: a) Pressure pipe Ø 90PE-RC open trench - approx. 1556 m,b) Pressure pipe Ø 90PE-RC trenchless - approx. 214 m,c) Pressure pipe Ø 110PE-RC trenchless - approx. 341 m.2) Gravity sewer construction: a) Gravity sewer network Ø250 stoneware jacking - approx. 722 m,b) Gravity sewer network Ø250 stoneware - approx. 1,271 m,c) Gravity sewer network Ø200 stoneware jacking - approx. 812 m,d) Gravity sewer network Ø200 stoneware - approx. 325 me) Gravity sewer network Ø250 PVC - approx. 20 m,f) Ø200 PVC gravitational sewer network in a protective pipe (jacking) - approx. 146 m,g) Ø200 PVC gravitational sewer network - approx. 11,638 m,h) Ø200 PVC gravitational sewer network for disposal - approx. 30 m,i) Gravity sewer section Ø160PVC ended with a plug - approx. 3,247 m,j) Gravity sewer section Ø160 jacking stoneware ended with a plug - approx. 11,3 m,k) Gravity sewer section Ø200 jacking stoneware ended with a plug - approx. 13.5 m,l) Well DN600PP - 4 pcs.m) Concrete well DN1200 - 515 pcs.n) Concrete well DN1500 - 31 pcs.o) Concrete well DN2000 - 34 pcs.p) Expansion well DN625 - 4 pcs.r) Sewage pumping station DN1500 - 4 pcs.s) Gate valve chamber with flow meter DN1500 - 4 pcs.t) Knife gate valve DN80 for installation directly in the ground - 2 pcs.u) Wall mounted knife gate valve for installation inside the well - 1 pcs.w) Well with venting and airing valve - 3 pcs.z) Drainage well - 2 pcs.3) Water mains constructiona) Reconstruction of water mains - approx. 10mb) Water connection Ø40 PE with fittings - 139 mc) Overground hydrant Dn80 with fittings and fittings - 1 kpl.d) Water meter well DN1200 - 4 kpl.e) Drainage valve DN20 - 4 pcs.4) Other works: a) reconstructing the area after the works to its original state and in accordance with the documentation b) making and agreeing on a project of temporary organization of traffic) building a sewage pumping station together with land development - 4 pieces2. A detailed description of the subject matter of the contract is specified in the ToR and the technical documentation attached to it.
- Opportunity closing date
- 07 September 2020
- Value of contract
- to be confirmed
About the buyer
- Address
- Spółka Komunalna Żukowo Sp. z o.o. ul. Pod Otomino 44 Żukowo 83-330 Poland
- Contact
- m.sirocki@skzukowo.pl
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.