Poland - Construction work for power stations and combined heat and power plants

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
21 August 2019
Opportunity publication date
23 July 2019
Category
45251000: Construction works for power plants and heating plants
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The subject of the contract is the turnkey construction of an installation consisting of: - Gas Block (further: BG), including a Gas Turbozool Plant (further: TG) with a capacity of approx. 52 MWe (±10%) with a steam-water recovery boiler with a capacity of approx. 52 MWt (thermal power in steam 1,0 MPa - 15 MWt / power in heating water ≥ 37 MWt), - gas-oil reserve peak, steam-water boilers with a capacity of approx. 60 MWt (hereinafter: NCRF; 2 water boilers with a thermal power of approx. 25 MWt each, 1 steam boiler with a thermal power of approx. 15 MWt), - gas-oil reserve peak, steam-water boilers with a capacity of approx. 60 MWt (hereinafter: NCRF; 2 water boilers with a thermal power of approx. 25 MWt each, 1 steam boiler with a thermal power of approx. 15 MWt). MWt - in a flame and flame tube solution) together with auxiliary and accompanying infrastructure, including installations, networks, technical equipment, land development, equipment and control software constituting a functional whole in PGE Energia Ciepła S.A. The subject of the contract covers, among others, design, delivery, construction, assembly, commissioning and commissioning of the System, training of the Employer's personnel, warranty service of the System and provision of TG maintenance services within 8 years from the date of entry into force of the service agreement (i.e. from the date of commissioning of the System). In the heating season, BG will satisfy the needs of heat for heating purposes and process steam as a generating unit cooperating with the existing EC II Bydgoszcz equipment, while in the summer it is not expected to cooperate with the existing EC II Bydgoszcz equipment. At the same time, BG will be designed and manufactured in such a way as to enable stable operation with full or partial electric load, with no heat dissipation in steam or hot water - operation on a hot chimney. In the summer season, the National Court Register will satisfy the needs of heat for heating purposes and process steam as a reserve unit, in case of failure, start-up and shutdown of the BG and lack of gas supply (operation on light heating oil).The Ordering Party requires that the newly designed BG and KRS can work independently of the existing technological part of EC II Bydgoszcz, thus enabling the repair of all devices and technological systems belonging to the existing part during the summer season.The Contracting Authority expects BG to be designed and constructed as a unit fired with high-methane natural gas - group E, while KRS - dual-fuel units, i.e. fired with high-methane natural gas - group E or light fuel oil. The subject of the contract will be executed in a separate area located in the immediate vicinity of the existing and operated power facilities of PGE EC S.A. The Contracting Authority requires that the delivery of the installation for operation (final acceptance date) shall take place no later than 10.11.2022.  Information on the ongoing proceedings and the Contracting Authority's requirements, including a detailed specification of the subject matter of the contract and a description of the needs and characteristics of the contract, are available on the website: https://swpp2.gkpge.plOstateczny The detailed scope of the contract shall be specified in the Terms of Reference, after conducting a dialogue with the Economic Operators.

Opportunity closing date
21 August 2019
Value of contract
to be confirmed

About the buyer

Address
PGE Energia Ciepła S.A. ul. Złota 59 Warszawa 00-120 Poland
Contact
rafal_ciarkowski@gkpge.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?