Germany - Construction work for pipelines, telecommunication and power lines

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
23 September 2019
Opportunity publication date
27 August 2019
Category
45231000: Construction work for pipelines, communication and power lines
Value of contract
£5m-50m
Your guide to exporting
Report opportunity

Description

Provision of construction services within the scope of an annual performance schedule including on-call duty. Construction services for local network extensions of drinking water pipelines: These are exclusively new development areas in open terrain. As a rule, the contractor is commissioned to lay the main water pipe. The following services must be provided: Earthworks Shoring work, road and path construction work, dewatering and pipe construction. existing main lines and house connections are to be replaced by completely new lines in built-up local or urban areas for the construction work for local network renewals. This work is often carried out in conjunction with road or canal renovations. The road and canal construction works are then carried out by the towns or municipalities. The construction sequence must be coordinated with the road construction companies. Depending on the process, the service provision is to be expected in sub-sections. As far as a renewal of the drinking water pipelines is necessary, the necessary surface works are also carried out. As a rule, the following services are to be provided: Earthworks, shoring work, road and path construction work, dewatering, carcass work, wall penetration and core drilling. valves such as gate valves and hydrants have to be replaced at the customer's supply systems when refurbishing existing systems. Collective orders are placed for at least 5 construction pits as individual orders, but only for one association municipality in each case. The works include the complete execution with road and pipeline construction. As a rule, the following services are to be provided: The construction work removal of damages includes the repair of pipe bursts in the entire association area during the normal and outside of the regular office hours depending on the order requirement. The works include the complete execution of road, earth and repair works. As a rule, the following services are to be provided: The on-call service for the removal of damage to drinking water supply lines includes the repair of pipe bursts and other damage in the entire association area in the time on weekends from Saturday and Sunday from 7:00 a.m. to 4:00 p.m. as well as for the time between Christmas up to and including New Year or on public holidays. As a rule, the same construction work is required as for the repair of damage during normal working hours, plus site equipment, road safety measures and separate hourly wage work.

Opportunity closing date
23 September 2019
Value of contract
£5m-50m

About the buyer

Address
Zweckverband Gruppenwasserwerk Dieburg Außerhalb Hergershausen 2 Babenhausen 68432 Germany
Contact
lutz@wasserwerk.com

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?