Poland - Construction work

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
09 December 2022
Opportunity publication date
28 October 2022
Category
45000000: Co
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

I. Automation and telecommunication branch:The scope of the automation branch works includes:- supply and installation of a complete signaling system with emergency power supply built in technical containers;- supply and installation of modern switch actuators on used turnouts together with replacement of turnout elements necessary for their proper connection;- supply and installation of modern derailleurs together with actuators;- installation of new high and low signals;- installation of system control of track and turnout necessity based on axle counters;- installation of double-circuit double-direction line interlocking with unoccupied control on the Świdnica Miasto - Jaworzyna Śląska route; - incorporation of the existing and planned Eap94 line interlockings on the Świdnica Kraszowice - Świdnica Miasto (line 137) and Świdnica Przedmieście - Świdnica Miasto (line 771) routes into the new signaling system; - installation of a remote release and locking system for the operation of sidings on the Świdnica Miasto - Jaworzyna Śląska route: Zawiszów Heat Plant km 228.652 (turnout No. 201) and Electrolux km 229.815 (turnout No. 301);- replacement of crossing equipment.The scope of the Telecommunications Work includes:- installation of watchtower communications between the cabinets securing the dependency keys for the operation of sidings, and the Świdnica Miasto control room;- replacement of radio telephones of the road train and shunting network, channel 1;- modernization of the antenna system in such a way as to guarantee the maintenance of propagation on the adjacent routes;- installation of a new CCTV system at the cat. A at km 226.587 and at 227.275;- installation of SKP systems;- installation of wired communications equipment;- construction of fiber optic cables;- removal of collisions;- reconstruction of telecommunications cable routes;II. Electrical power industryThe scope of electrical power works includes:- construction of lighting at the railway-road crossing at km 226.587 and at km 227.575 of railroad line No. 137;- construction of lighting at the turnout heads of the entrances from Mościsko Dzierżoniowskie, Świdnica Przedmieście turnouts 1, 2, 7, 8, 9, 10, 13, 14;- construction of a primary and backup power supply system for the purpose of supplying the newly designed power equipment as well as srk and teletechnical equipment at Świdnica Miasto station and railway-road crossings;- installation of electric heating at turnout nos. 1, 2, 7, 8, 9, 10, 13, 14, 21, 22, 24;- removal and protection of all collisions resulting from the Contractor's technology of works;- dismantling of old equipment.
Design and execution of works for the task entitled: "Modernization of Świdnica Miasto station" within the project "Digitalization of railroad infrastructure through the installation of modern equipment and systems stage 3."

Opportunity closing date
09 December 2022
Value of contract
to be confirmed

About the buyer

Address
PKP Polskie Linie Kolejowe S.A. Zakład Linii Kolejowych w Wałbrzychu Parkowa 9 Wałbrzych 58-302 Poland
Contact
karolina.szczepinska@plk-sa.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?