Description

The subject of the contract is the construction of the Pilzno GPZ station together with power lines, stage 1 - Construction of 110/15 kV Pilzno GPZ station.The contract concerns a project/programme applying for funding from the European Union.Priority; VII Improvement of energy security Action 7.1. Development of intelligent energy storage, transmission and distribution systems - Operational Programme Infrastructure and Environment 2014-2020.The detailed scope is defined in the contract documents.
The subject of the contract is the construction of the Pilsen GPZ Plzeň substation with power lines stage 1 - Construction of 110/15 kV Plzeň GPZ station.The contract concerns the project/programme applying for EU funding.Priority; VII Improvement of energy security.Measure 7.1. Development of intelligent energy storage, transmission and distribution systems - Operational Programme Infrastructure and Environment 2014-2020.The subject of the agreement also covers the execution of executive projects in the field:a) the technical protection system and fire alarm system for the construction of SE Plzeň, in accordance with the Requirements for the technical protection system and fire alarm system - Annex No. 1 to OPZ; b) for the installation of sectional protections of 110 kV Latoszyn and 110 kV Ładna lines together with communication channels in place of the currently designed in the executive design of earth fault protection;c) for replacement of earth fault protection for 110 kV Pilzno (currently Latoszyn) line 110 kV sectional protection in 110/15 kV Ładna substation; d) for replacement of earth fault protection for 110 kV Pilzno (currently Ładna) line 110 kV sectional protection in 110/30/15 kV Latoszyn substation; e) for ensuring compliance with newly developed technologies in the ICT system the communication devices included in the executive design should be extended by modules, cards and licenses ensuring compliance with MEF Carrier Ethernet 2 specification.0, support of MPLS TP protocol, TDM over Packet - SAToP, ERPS G.8032 redundancy v2, PRP/HSR, ITU-T G.8261 SyncE Ethernet, Precision Time PTP 1588 Power Profile C.37-238 and MACsec IEEE 802.1AEbn-2011 data encryption and integrity with a 256-bit AES key. To support all 15 kV MV MV switchgear line fields, install PMU phaser measurement modules cooperating with the ICT system via Ethernet links with PTP 1588 Power Profile C.37-238.From the 15 kV MV MV switchgear line fields lead out the measuring circuits to PMU modules;f) in the scope of ventilation, air-conditioning and space heating of the building;- install in each of the rooms where air-conditioning is planned.Double set of air conditioners for alternate operation - use wall controllers of air conditioners instead of remote controls, - install control by the control panel of power supply circuits of air conditioners, and therefore use air conditioners equipped with autorestart function, ensuring after power supply is switched on again to start working with previous settings, - provide a solution for remote supervision and configuration of air conditioners work via Ethernet,- install a reference detector of external temperature and humidity, - ensure integration of air-conditioning, ventilation and heating equipment with the technical protection system - emergency shutdown in the event of fire, detection of the presence of the operator at the station, - ensure integration with the existing system of object supervision at the Customer's premises - IFTER EQU, - install the control panel of the control panel in the control room for user settings, g) for implementation of transition stages of construction specified in the WRI.The detailed scope is specified in the order documents.

Opportunity closing date
06 August 2020
Value of contract
to be confirmed

About the buyer

Address
Tauron Dystrybucja Spółka Akcyjna Oddział w Tarnowie ul. Lwowska 72–96B Tarnów 33-100 Poland
Contact
monika.olszewska-marek@tauron-dystrybucja.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?