Poland - Construction work

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
03 February 2023
Opportunity publication date
28 December 2022
Category
45000000
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Construction of a bridge over the Narew River with access roads. Construction of a bridge crossing over the Narew River with an access road connecting the national road No. DK 61 in Teodorowo, Municipality of Rzekuń, Ostrołęka County, with the district road No. 2539W in Łęg Przedmiejski, Municipality of Lelis, Ostrołęka County, Mazowieckie Province. The order includes:ROAD BRANCH - ROAD ROUTE,SIGNING AND SAFETY EQUIPMENT,RESISTANCE WALLS,REINFORCEMENT OF BASE SUBJECT,ROAD BRIDGE MD-1,ROAD BRIDGE MD - 3 (Rz. Narew),utility crossing PG-2,culverts PZ-1,SANITARY INDUSTRY - DRAINAGE,TELECOMMUNICATIONS INDUSTRY - TELECOMMUNICATIONS INFRASTRUCTURE,SANITARY INDUSTRY - RECONSTRUCTION OF SANITARY SEWERAGE,SANITARY INDUSTRY - RECONSTRUCTION OF WATER MAINS,SANITARY INDUSTRY - RECONSTRUCTION OF GAS MAINS,ELECTRICAL INDUSTRY,ELECTRICAL INDUSTRY - RECONSTRUCTION OF OVERHEAD LINE,RECONSTRUCTION OF OVERHEAD POWER WN,GREENERY.
1 The subject of the contract is: Construction of a bridge over the Narew River with access roads. Construction of a bridge crossing over the Narew River with an access road connecting the national road No. DK 61 in the village of Teodorowo, Municipality of Rzekuń, Ostrołęka County, with the district road No. 2539W in the village of Łęg Przedmiejski, Municipality of Lelis, Ostrołęka County, Mazowieckie Province. (2) The contract includes:1) ROADWORK - ROAD ROUTE,- preparatory works,- earthworks,- substructures, pavements,- finishing works,- street elements. 2)MARKINGS AND SAFETY EQUIPMENT - vertical markings - existing - medium to be relocated,- vertical markings - existing - medium - to be decommissioned,- support structures - designed,- support structures - to be decommissioned,- support structures - to be relocated,- horizontal signage - designed,- horizontal signage - existing - repainting,- horizontal signage - existing - to be decommissioned,- safety devices - designed,- safety devices - existing - cleaning,- safety devices - to be decommissioned. 3)RESISTANCE WALLS- preparatory works,- reinforcement,- concrete,- insulation and paving,- object drainage,- expansion joints,- safety elements,- additional works,4)BASE REFUNDING- preparatory works,- foundation,- reinforcement,- concrete,- earthworks,- additional works.5.)MD-1 ROAD BRIDGE- preparatory works,- foundation,- reinforcement,- concrete,- insulation and paving on the structure,- drainage of the structure,- bearings,- expansion joints,- safety elements,- other bridge works- additional works.6)ROAD BRIDGE MD - 3 (River Narew)- preparatory works,- foundations,- reinforcement,- concrete,- steel structures,- insulation and paving on the object,- drainage of the object,- bearings,- expansion joints,- safety elements,- other bridge works,- additional works.7)GOVERNMENT TRANSIT PG-2- preparatory works,- foundations,- reinforcement,- concrete,- insulations and paving on the object,- drainage of the object,- expansion joints,- safety elements,- other bridge works,- additional works.8)CIRCULATIONS PZ-1- preparatory works,- foundations,- reinforcement,- concrete,- insulation and paving on the object,- dewatering of the object,- expansion joints,- safety elements,- other bridge works,- additional works.9) SANITARY INDUSTRY - DRAINAGE- preparatory works,- earthworks,- assembly works,- dismantling works,- other works.10.)TELECOMMUNICATIONS INDUSTRY - TELECOMMUNICATIONS INFRASTRUCTURE - process ducting,- reconstruction of teletechnical ducting,- manhole adjustments,- reconstruction of fiber optic cables,- reconstruction of copper cables,- dismantling.11) SANITARY SEWER SYSTEM - SANITARY SEWER RECONSTRUCTION- preparatory works,- assembly works - linear,- assembly works - connection manhole,- assembly works - manhole with DN125 cleaner,- assembly works - manhole with DN 80 cleaner,- assembly works - measurement manhole,- disassembly works,- other works.12) SANITARY SEWER SYSTEM - reconstruction of water mains- preparatory works,- assembly works,- dismantling works,- other works.13) SANITARY SEWER SYSTEM - GRAS SEWER SYSTEM REJECTION- preparatory works,- earthworks,- assembly works,- dismantling works,- other works.14) ELECTRICAL INDUSTRY- construction of traffic circle lighting,- bridge lighting,- Energa lighting,- demolition of Energa,- demolition of DK 61.15)ELECTRICAL INDUSTRY - CONSTRUCTION OF SUPERVERSIVE LINE- LV municipal line circuits,- construction of MV line,- dismantling of LV, MV line.16) RECONSTRUCTION OF ELECTRROENERGY NETWORKS overhead HV- preparatory works,- reconstruction, construction and extension of HV overhead power networks,- earthworks.17) GREENING- preparatory works,- road greenery. 3.Detailed description of the execution of the subject matter of the order is contained in: design documentation, technical specifications for execution and acceptance of works, bills of quantities, description of the subject matter of the order, which are annexes to the SWZ.

Opportunity closing date
03 February 2023
Value of contract
to be confirmed

About the buyer

Address
Zarząd Dróg Powiatowych w Ostrołęce ul. Lokalna 2 Ostrołęka 07-410 Poland
Contact
zdpo-ka@wp.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?