Poland - Construction work

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
15 November 2021
Opportunity publication date
20 September 2021
Category
45000000: Co
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The subject matter of the order is the execution of construction works on the section Bodzechów - Sandomierz within the scope of the project "works on railway line no 25 at section Skarżysko Kamienna - Sandomierz": CONSTRUCTION WORKS ON THE SECTION BODZECHÓW - SANDOMIERZ WITHIN THE PROJECT "WORKS ON RAILWAY LINE NO 25 ON THE SECTION SKARŻYSKO KAMIENNA - SANDOMIERZ" IMPLEMENTED UNDER THE OPERATIONAL PROGRAMME EASTERN POLAND 2014-2020.
The subject matter of the order is the performance of construction works on the section Bodzechów - Sandomierz . The basic scope of the contract includes: - Works on engineering structures in track no. 1 in km: 236.555 and 240.127;- Works on fifteen engineering objects in track no. 1 and 2 in km: 203.624; 205.812; 206.052; 206.063; 207.060; 211.233; 212.111; 213.162; 215.415; 224.866; 226.213; 227.903; 228.514; 228.760; 231.762;- Construction of a road in the Municipality of Brody for a length of approximately 460 m.The right of option No. 1 includes:- Works (repair, reconstruction, maintenance) on twenty-five engineering structures (at km 201.697; 206.745; 208.337; 208.667; 212.432; 213.782; 214.293; 214.822; 216.448; 216.726; 216.943; 217.220; 218.858; 220.027; 225.238; 225.914; 226.425; 226.853; 227.298; 228.240; 230.966; 232.650; 233.080; 233.814; 234.954) in Track No. 2.The right of option no. 2 covers:- Works (renovation) on the engineering object - bridge on the Vistula river in km 235.682 in track no. 1.The whole subject of the Order includes the following elements:1. Execution of works within the following scope:1) surface and substructure,2) overhead line with power supply,3) devices and systems of electrical power engineering up to 1 kV,4) engineering objects,5) geology.2.Execution of works consisting in construction of environmental protection facilities.3. As-built documentation, including: - development of technical regulations, in cooperation with the Contracting Authority, based on Ir-3 Instruction, after the completion of construction works, for all branches,- development of as-built geodetic documentation- as-built geodetic documentation, including: line picketing and railway line longitudinal profile, - handover and acceptance protocols for track alignment adjustment signs, - numeric situation and height map with as-built geodetic inventory, - development of documentation for establishing and measuring the Railway Basic Geodetic Network and the Railway Special Network, - development of new schemes for traffic posts and dispatching points.Detailed description of the subject matter of the contract has been presented in Volume III, IV and V of the SWZ.

Opportunity closing date
15 November 2021
Value of contract
to be confirmed

About the buyer

Address
PKP Polskie Linie Kolejowe S.A ul. Targowa 74 Warszawa 03-734 Poland
Contact
sylwia.bielinska-sek@plk-sa.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?