Germany - Construction work

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
08 December 2022
Opportunity publication date
25 November 2022
Category
45000000: Co
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Extension of the day care center in 54451 Irsch
Lot 1 Carcass work-5 pieces of reinforced concrete base of the PV system dismantle and dispose of.-5 pieces of reinforced concrete foundation of the PV system dismantle and dispose of.-40 lfdm cuts in the asphalt pavement, depth 18-20 cm.-150 m2 blacktop pavement demolish, remove and dispose of (AVV 17 03 02).-45 cbm removal and disposal of the base course of the bituminous surfaces.-6 lfdm curb and gutter slabs demolish, remove and dispose of.-50 m2 concrete slab pavement removal, 8 cm thick.-30 rm square wire mesh fence removal and disposal.-30 rm bushes as cherry laurel hedge clearing, clearing material disposal.-2 pieces street drain dismantle, remove and dispose of.-1 pieces disassembly and removal of side entrance door.-2 m2 wall partial demolition masonry (single-shell), wall thickness approx. d=24cm.-35 m2 demolition of ETICS system on outer wall, disposal.-290 cbm excavation-250 cbm pipe trench excavation for drainage lines and electric line-100 lfdm waste water line.-30 lfdm waste water line for greasy waste water.-75 lfdm rain water line.-55 lfdm cable protection pipe.-75 lfdm drainage.-20 lfdm drinking water pipe made of PE-Xa.-1 piece inspection shaft.-1 piece of backwater protection, mechanical.-2 piece of one-size-fits-all house inlet.-40 piece of trench fillers, multi-layer installation.-1 piece of system shafts for trench fillers.-1 piece of system shaft as basin overflow for trench fillers.-1 piece of rainwater cleaning shaft-25 cbm foundation concrete C25/30, XC2, XF1, WF-265 m2 production of base plate-120 m2 perimeter insulation, 12 cm thick.-11 cbm beams, overpasses, ring anchors-96 m2 prefabricated reinforced concrete slabs.-1 piece staircase, 1 flight, 10 pieces.- 5 m2 manufacture reinforced concrete wall d=30cm.- 13 to structural steel (BST 500 (S) and BST 500 (M) supply and install.-200 m2 Bins masonry VBL 2/0,45 produce-215 m2 masonry HBL 4/0,9 produce-50 m2 masonry VBL 2/1,0 produce-140 m2 waterproofing external wall-105 m2 dimpled sheeting Lot 2 carpentry-25 m2 demolition monopitch roof with standing seam roofing (zinc).-6 lfdm existing gutter and eaves sheeting remove and dispose of.-8 cbm glulam, GL28c, NK 1, NSi for roof construction.-260 lfdm glulam for roof construction.-8 cbm solid construction timber C24, NK1 NSi for roof construction.-350 6 cbm solid structural timber C24, NK1 NSi for dormer construction -180 lfdm solid structural timber for dormer construction -290 m2 diffusion-open sub-deck board, d=60 mm supply and fasten -70 m2 diffusion-open sub-deck board, d=35 mm supply and fasten -385 m2 counter-battening, main roof construction m2 counter-battening, main roof 40/60 mm.-75 m2 counter-battening dormer area 40/60 mm.-310 m2 cellulose insulation between rafters, 039, 280 mm.-25 m2 rock wool between rafters, 035, 280 mm.-310 m2 wood fiber board type OSB 3 E1, d=18 mm (roof slope).-120 m2 wood fiber board type OSB 3 E1, d=18 mm (dormer).-25 m2 rock wool over-rafter insulation. Lot 3 Roofing and plumbing -310 m2 Supporting battens for clay tiles 30/50.-25 m2 Supporting battens for clay tiles as metal battens over fire wall.-75 m2 Rough sheeting, rough sawn, for dormer roof surfaces.-45 m2 Rough sheeting, rough sawn, for dormer cheek surfaces-10 m2 Check, rework, repair and renew existing main roof surface.-310 m2 Roof surface clay tiles. m2 roof surface clay tiles.-3 pieces of continuous tiles-55 lfdm snow guard grating.-2 pieces of solar continuous tiles.-30 pieces of solar element holders.-120 m2 installation of the existing PV system.-75 m2 zinc double standing seam roofing, trailing dormer.-1 piece of facade cladding in angled standing seam technique of the cheeks and mirror of the trailing dormer.-55 lfdm eave formation with zinc gutter 333 and inlet plate-10 pieces gutter dilatation-5 pieces gutter angle-5 pieces gutter hook-in socket DN 120-25 lfdm rainwater downpipe DN 120-20 lfdm wall connection to existing wall.-7 rm dormer saddle valley, cut 600, rolled lead 2.0 mm-16 rm breast plate, cut 400, rolled lead 2.0 mm on dormers-55 rm drip plate dormer eaves of titanium zinc-2 rm zinc window sills (dormer lattice) Lot 4 Scaffolding-300 m² working and protective scaffolding, LK 3-60 lfdm roof safety scaffold eaves-120 lfdm console widening 30er-15 lfdm roof dormer scaffold Lot 5 Lightning protection and grounding work-120 lfdm arrestor cable DIN EN 62561-2 on new roof slate-30 lfdm down conductor DIN EN 62561-2-100 St clamps various designs-120 m grounding collector cable V4a-8 St separation points-4 St depth grounding-90 m foundation grounding-1 St inspection of existing system

Opportunity closing date
08 December 2022
Value of contract
to be confirmed

About the buyer

Address
Vergabestelle der Verbandsgemeinde Saarburg-Kell Rathausstraße 2 Kell am See 54427 Germany
Contact
vergabestelle@saarburg-kell.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?