Poland - Construction work

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
06 August 2020
Opportunity publication date
03 July 2020
Category
45000000: Co
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The subject of the contract is the design and construction of a collision-free road link in the form of a pedestrian-vehicle tunnel with access roads between Bedoń Przykościelny and Andrespol in the municipality of Andrespol. The engineering facility will be located in the course of the district road no. 2912E, in place of the existing category A railway crossing in km 13+162 of line no. 17 of the Łódź Fabryczna - Koluszki route and in km 18+175 of line no. 25 of the Łódź Kaliska - Dębica route.
2.1 The subject of the contract is the design and construction of a collision-free road link in the form of a pedestrian-vehicle tunnel with access roads between Bedoń Przykościelny and Andrespol in the gmina of Andrespol. The engineering facility will be located in the course of district road no. 2912E, in place of the existing category A railway crossing in km 13+162 of line no. 17 of the Łódź Fabryczna - Koluszki route and in km 18+175 of line no. 25 of the Łódź Kaliska - Dębica route.The entire subject matter of the contract includes execution of:2.2.1. design documentation necessary for proper execution of all works and obtaining for it all required opinions, arrangements, approvals, conditions, decisions and permits necessary for execution of the subject matter of the contract;2.2.2. all works in accordance with the scope of the contract on the basis of the design documentation referred to in item 2.2.1, prepared by the Contractor and approved by the Contracting Authority, and all preparatory works necessary for execution of the scope of the contract and execution of all actions required by law;2.2.3. carrying out the assessment of conformity of the Control-Command and Signalling Structural Subsystem - track-side equipment covered by the scope of the contract at each stage (design, construction and final testing of the subsystem).2.3. The contract covers design and execution of works in the field of track-side, engineering, sanitary, traffic control and signalling equipment, technical devices, collision-free crossing of the railway line with the road system, non-traction power engineering and telecommunication, and all other infrastructure of land utilities resulting from the development of documentation.2.4 The order shall cover the full scope included in the functional-utility program and the concept of program-spatial construction of the tunnel under the railway tracks in the course of Brzezińska Street of the district road No. 2912E between Bedon Przykościelne and Andrespol, in particular:2.4.1. execution of the structure constituting the support for the tunnel ceiling (or according to other alternative technology);2.4.2. installation of sheet piling walls on access roads;2.2.4.4. installation of steel beams and concreting of the tunnel ceiling;2.4.5. concreting of the sheet piling tub and tunnel side walls;2.4.6. execution of staircases;2.4.7. installation of the roofing;2.4.8. execution of transition zones;2.4.9. laying of the railway surface;2.4.10. execution of the road surface and pavement with the drainage system. The works in this scope include in particular execution of: invasion from the side of Andrespol in the form of a pedestrian and driving route with access roads to the property (eastern part of the district road), bidirectional road within the tunnel connecting Andrespol with Bedon Przykościelny, bidirectional road from the side of Bedon Przykościelny, connecting ul. Brzezińska with Kolejowa Street, a bidirectional road from the side of Andrespol with access to the car park (western part of the district road), the car park (western part of the district road). Rainwater channels will discharge rainwater to the self-service rainwater pumping station, equipped with a power generator;2.4.11. construction of lighting;2.4.12. execution of tunnel monitoring;2.4.13. execution of vertical and horizontal marking;2.4.14. execution of other works, which will result from detailed design documentation prepared by the Contractor.2.5 It is assumed that the task will be performed in the following stages:1) stage I - design works, obtaining the necessary administrative decisions, arrangements and permits (including the ZRID decision, tree felling, etc.);2) stage II - preparatory works;3) stage III - earthworks and ground preparation;4) stage IV - construction works;5) stage V - finishing works;6) stage VI - formal and legal activities.2.8.

Opportunity closing date
06 August 2020
Value of contract
to be confirmed

About the buyer

Address
Gmina Andrespol ul. Rokicińska 126 Andrespol 95-020 Poland
Contact
zamowienia@andrespol.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?