Switzerland - Construction work
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 24 April 2020
- Opportunity publication date
- 09 March 2020
- Category
- 45000000: Construction work
- Value of contract
- to be confirmed
- Your guide to exporting
Description
The noise protection wall Waldwiese in Mumpf is 150 m long and has a height of 3.0 - 4.8 m. Due to the proximity to the buildings, the upper wall elements are made of glass. The lower elements are made of concrete. The individual foundations, arranged at a standard distance of 4.0 m, are founded with micropiles of 10 m length each. The steel girders are screwed to the pile head foundations with a foot plate The noise protection wall is located in a topographically unfavourable area. In steep terrain, clamped between the railway line and the real estate, the accessibility for the construction work is very limited. It is expected that a pneumatic crane will be used to lift the elements above the properties. A continuous working scaffold is planned for the valley side.
- Opportunity closing date
- 24 April 2020
- Value of contract
- to be confirmed
About the buyer
- Address
- Bundesamt für Straßen ASTRA Filiale Zofingen Brühlstraße 3 Zofingen 4800 Switzerland
- Contact
- beschaffung.zofingen@astra.admin.ch
The deadline to apply for this opportunity has passed.