Switzerland - Construction work

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
24 April 2020
Opportunity publication date
09 March 2020
Category
45000000: Construction work
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The noise protection wall Waldwiese in Mumpf is 150 m long and has a height of 3.0 - 4.8 m. Due to the proximity to the buildings, the upper wall elements are made of glass. The lower elements are made of concrete. The individual foundations, arranged at a standard distance of 4.0 m, are founded with micropiles of 10 m length each. The steel girders are screwed to the pile head foundations with a foot plate The noise protection wall is located in a topographically unfavourable area. In steep terrain, clamped between the railway line and the real estate, the accessibility for the construction work is very limited. It is expected that a pneumatic crane will be used to lift the elements above the properties. A continuous working scaffold is planned for the valley side.

Opportunity closing date
24 April 2020
Value of contract
to be confirmed

About the buyer

Address
Bundesamt für Straßen ASTRA Filiale Zofingen Brühlstraße 3 Zofingen 4800 Switzerland