Germany - construction services

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
30 October 2020
Opportunity publication date
02 October 2020
Category
71500000: Co
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The traffic situation on the existing B 87 is characterised by a high proportion of through traffic in the Bad Kösen through road (OD). The construction of the bypass (OU) is necessary with the aim of relieving the town centres and ensuring the spa status. The new construction of the B 87 is classified as an urgent requirement in the Federal Transport Infrastructure Plan 2003 The planned OU Bad Kösen i. Z. d. B 87 has a total length of 13.25 km. The construction route begins in the west east of the village of Taugwitz, where the route of the B 87 will be swung from the existing road to the southeast. In the further course of the project, the river Saale will be crossed near Kleinheringen in the course of a large bridge. The route then leads south around Bad Kösen. About 1 km east of Neuflemmigen, the new road ends with the connection to the crossing federal road B 88. This involves a total of 7 drainage basins (4 rainwater retention basins (RRB) and 3 infiltration basins (VSB)), as well as a noise barrier and a bat crossing aid. The noise barrier has a length of approx. 300 m and a height of approx. 2.00 m to 3.50 m. The total construction costs, including the structures, amount to approx. 159.4 million Euro gross.
- Local construction supervision for traffic facilities (incl. deconstruction and equipment trades: in particular marking, signage, protective equipment, traffic guidance during the construction period) and for engineering structures (rainwater retention basin, infiltration basin, bat overflight aid) as a special service in accordance with HOAI 2013 Annex 13, Item 13.1 to § 47 Paragraph 2 and Annex 12, Item 12.1 to § 43 Paragraph 4;- Safety and health protection coordination in accordance with the Construction Site Ordinance;- Partial services of environmental construction supervision.

Opportunity closing date
30 October 2020
Value of contract
to be confirmed

About the buyer

Address
Landesstraßenbaubehörde Sachsen-Anhalt, Regionalbereich Süd An der Fliederwegkaserne 21 Halle (Saale) 06130 Germany
Contact
vergabestelle_freiberufliche_leistungen@lsbb.sachsen-anhalt.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?