Germany - Construction of railway tunnels

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
18 November 2019
Opportunity publication date
18 October 2019
Category
45221242: Railway tunnel construction work
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The district of Calw has taken over the section Weil der Stadt - Calw of the "Württembergische Schwarzwaldbahn" (route 4810) from the Deutsche Bahn AG on 1.1.1994 and since then aims at a new traffic start as "Hermann-Hesse-Bahn". In the meantime, both the project management and the ownership of the line have been transferred to the Zweckverband Hermann-Hesse-Bahn. The planned transport services make it necessary to shorten the historical route between Weil der Stadt and Ostelsheim by approx. 3 km. For this purpose, a 498 m long, single-track new tunnel with a length of approx. km 27.8 + 40 to 32.9 + 25 is to be constructed in the "Ostelsheimer Kurve" in the section from approx. km 27.8 + 40 to 32.9 + 25. The subject of the planned negotiation procedure with an upstream competition for participation is the shell construction of the tunnel, the upstream and downstream preliminary cut as well as the equipment of the tunnel with a dry extinguishing pipe including extinguishing water storage tank and extinguishing water collection basin. Not included in the scope of services are the technical railway upgrading with track bodies and tracks as well as the tunnel equipment (control and safety technology, radio, etc.). The contractor must draw up the detailed design during construction:- tunnel (l = 460 m),- excavation approx. 27 000 m3,- shotcrete approx. 12 500 m2,- sealing / securing working face approx. 5 500 m2,- steel mats securing approx. 140 t,- anchor tunnel approx. 3 250 pc,- Tunnel approx. 4 000 m,- Construction drainage approx. 460 m,- Separating fleece Outer shell approx. 12 500 m2,- Injection hoses approx. 7 000 m,- Concrete Inner shell approx. 6 000 m3,- Reinforcing steel Inner shell approx. 800 t,- Internal joint tape approx. 1 300 m,- Joint plate approx. 1 000 m,- Stone fibre boards approx. 400 m2,- filling concrete and top concrete approx. 250 m3,- formwork empty conduits and shafts approx. 1 300 m2,- empty conduits approx. 4 500 m.preliminary cuts & tunnel open construction:- excavation approx. 16 000 m3,- drill girder shoring approx. 200 m2,- bored piles Ø 60 cm approx. 80 m,- prestressed anchors approx. 88 pcs,- Shotcrete approx. 1 850 m2,- Soil nails approx. 2 500 pcs.,- Gabions approx. 1 400 pcs.,- Formwork Tunnel open BW "Vault" approx. 600 m2,- Concrete Tunnel open BW approx. 800 m3,- Reinforcing steel Tunnel open BW approx. 130 t.Fire-fighting water supply:- Fire-fighting water storage tank 96 m3 (steel) approx. 1 pc.,- Fire-fighting water collection tank 120 m3 (reinforced concrete) approx. 1 pc.,- Dry fire-fighting water pipe approx. 600 m.

Opportunity closing date
18 November 2019
Value of contract
to be confirmed

About the buyer

Address
Zweckverband Hermann-Hesse-Bahn c/o Landratsamt Calw Vogteistraße 42-46 Calw 75365 Germany
Contact
vergabestelle@avg.karlsruhe.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?