Poland - Central heating boilers

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
02 September 2020
Opportunity publication date
01 August 2020
Category
44621220: Ce
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The subject of the contract is the replacement of low-efficiency heat sources, i.e. solid-fuel boilers with new high-efficiency heat sources - including: supply and installation of 24 condensing gas boilers (for natural gas) and 6 biomass - pellet boilers (with automatic backfilling) in households in the Tuszów National Municipality. The project is implemented as part of the project: "STOP WITH SMOGIEM in the commune of Tuszów Narodowy".
The subject of the contract includes replacement, based on the technical documentation available, of the existing 30 solid-fuel central heating boilers with gas-fired condensing boilers, and biomass-fired boilers, in particular: disconnection of the existing boilers with tanks from central heating installations, cold and hot water, in existing open systems, dismantling (or cutting off) the expansion vessels of the open system (installing cut-off valves and above them air vents at the cut-off point), delivery and connection of new boilers to the central heating installation of the cold and hot water system, existing gas system. The scope of the order includes: disassembly and handing over to the resident of the old solid fuel central heating boiler; delivery and installation based on the documentation available to the resident of 24 new sets of gas condensing boilers (natural gas), and 6 sets of biomass boilers (with automatic backfill) with adaptation of their installation to the existing heating systems for central heating and central heating. in the objects,- installation of a biomass boiler journal with cleaning and connection of the biomass boiler with a hot pipe to the existing flue pipe of the chimney,- connection of the boiler to the existing central heating installation of the building (adapted to the conditions of the object),- connection of the gas boiler to the existing gas installation of the building (adapted to the conditions of the object).* cost of adaptation of the central heating installation. installation of the necessary devices based on the technical description of the boiler, as well as external temperature sensors and required sensors to cooperate with the existing installation, - execution of a departure to the hot water installation ended with DN20 valves, - cost of connecting to the hot water installation. remains on the side of the user of the object - installation of a heat meter with the assurance of reading the time of the installation operation and the amount of heat produced locally from the panel of the device and the possibility of expansion with a device to read data from the Internet, when such a function is not available to the installation controller,- installation of a boiler controller with external and room temperature sensors, sensors necessary to cooperate with the central heating installation, installation of the boiler controller with external temperature sensors, room temperature sensors, sensors necessary for cooperation with the central heating installation, - central heating system with regulation of the three-way valve, wiring for correct operation of the installation, with the possibility of expansion with a device for reading data from the Internet through the installed web browser, - execution of thermal insulation in accordance with applicable standards, - execution of rinsing and pressure tests of the installation, - filling of the installation, - filling of the wall, or, if necessary, filling of the installation, - supplementing the losses of walls. installation,- training of the user in correct and safe operation of the installation and its current maintenance,- providing the Ordering Party with the Installation Documentation for each location including: a. installation diagram, b. hydraulic system leakage protocol, c. installation certificate, i.e. a document signed by a certified installer certifying the technical parameters of the installation approved for use, d. simple instructions for use of the installation in Polish, e. declarations of conformity or safety certificates, certificates of conformity for built-in materials, f. technical cards of installed equipment, g. warranty cards of installed equipment, h. warranty card for performed works, and. protocol of user's training in safe operation of the installation together with handing over the instruction manual,j. protocol of installation acceptance signed by two representatives of the Ordering Party and the contractor, with the participation of the user,- installation adjustments to be made in 2025 as part of the granted guarantee to ensure its nominal operating parameters,- execution of other elements included in appendices to the ToR, including the model agreement constituting an appendix to the ToR.

Opportunity closing date
02 September 2020
Value of contract
to be confirmed

About the buyer

Address
Gmina Tuszów Narodowy Tuszów Narodowy 225 Tuszów Narodowy 39-332 Poland
Contact
gmina@tuszownarodowy.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?