Germany - Boiler plants
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 20 January 2020
- Opportunity publication date
- 23 December 2019
- Category
- 42160000: Boiler installations
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Stadtwerke Lübeck GmbH is planning to replace the existing peak load boiler system of the CHP cogeneration plant at Am Fahrenberg 2 in Lübeck-Travemünde. In the aforementioned CHP plant, 2 natural gas/fuel oil-fired peak load boilers with a firing thermal output (FWL) of approx. 6 MW each and 2 CHP modules with a FWL of 2.33 MW each are currently in operation. The aim is to replace the 2 existing peak load boilers incl. burner with 2 new natural gas-fired peak load boilers with an increased FWL of up to 7.6 MW each while maintaining the location in the boiler installation room. The replacement of the boilers is carried out on the basis of reaching the end of life of the existing boilers.
- Opportunity closing date
- 20 January 2020
- Value of contract
- to be confirmed
About the buyer
- Address
- Stadtwerke Lübeck GmbH Geniner Str. 80 Lübeck 23560 Germany
- Contact
- nils.retzlaff@netz-luebeck.de
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.