Germany - Boiler plants

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
20 January 2020
Opportunity publication date
23 December 2019
Category
42160000: Boiler installations
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Stadtwerke Lübeck GmbH is planning to replace the existing peak load boiler system of the CHP cogeneration plant at Am Fahrenberg 2 in Lübeck-Travemünde. In the aforementioned CHP plant, 2 natural gas/fuel oil-fired peak load boilers with a firing thermal output (FWL) of approx. 6 MW each and 2 CHP modules with a FWL of 2.33 MW each are currently in operation. The aim is to replace the 2 existing peak load boilers incl. burner with 2 new natural gas-fired peak load boilers with an increased FWL of up to 7.6 MW each while maintaining the location in the boiler installation room. The replacement of the boilers is carried out on the basis of reaching the end of life of the existing boilers.

Opportunity closing date
20 January 2020
Value of contract
to be confirmed

About the buyer

Address
Stadtwerke Lübeck GmbH Geniner Str. 80 Lübeck 23560 Germany
Contact
nils.retzlaff@netz-luebeck.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?