Poland - Architectural services for buildings

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
06 December 2019
Opportunity publication date
06 November 2019
Category
71221000: Architectural services for buildings
Value of contract
£0-100k
Your guide to exporting
Report opportunity

Description

Scope of study: - insulation of external overground and underground walls together with insulation of foundation walls, - insulation of the roof, - partial replacement of old window and door joinery (including liquidation of luxbers), - replacement of internal doors in the attic, - replacement of lightning protection system, - modernization of the thermal centre, - replacement of central heating system,- repair of basement transom lights (doświetlacze), - proper ventilation in the rooms through e.g. installation of wall ventilators or window ventilators (ventilators) - to be agreed with the customer, - replacement of external window sills, - repair of chimneys and ventilation openings, plastering and painting works to adjust their appearance to the façade,- reconstruction of rainwater sewage system approaches related to the removal of rainwater pipes and cleaners from the façade by the thickness of insulation and replacement of drain pipes and gutters, - reconstruction/renewal of roofs at entrances (including over the main entrance), - making a roof over the side entrance, - improving the aesthetics of the strip around the building after insulation of walls, - repair of all the elements related to the building, e.g.: - renovation of the roof on the entrances (including over the main entrance), - making a roof over the side entrance, - improving the aesthetics of the strip around the building after insulation of walls, - repair of all the elements related to the building, e.g. the roof, the roof, the roof, the roof, the roof, the roof... cornices, plinths, etc. and provide for all necessary works related to the insulation of the building, - temporary disassembly and assembly of devices/elements on the elevations of the building, e.g.: a. the building's façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade and the façade. removal of all disassembled metal/steel elements, e.g.: disassembled lightning protection system, window sills, metal sheets, pipes, gutters to the scrap yard, - repair/repair of stairs, renovation/replacement of window gratings, etc., - disposal of all disassembled metal/steel elements, e.g.: disassembled lightning protection system, window sills, metal sheets, pipes, gutters to the scrap yard, - repair/repair of stairs, renovation/replacement of window gratings, etc.Design documentation must include: - Building inventory in accordance with PN-ISO 9836:1997 - 1 ex,- Energy audit - 1 ex,- Building design and detailed design of thermal modernization of the building (the scope of the design must be consistent with the energy audit) - 4 ex,- Building design and detailed design of lightning protection system replacement - electrical industry - 4 ex,- Building design and detailed design of heat substation replacement - 4 ex,- Building design and detailed design of central heating system replacement - 4 ex,- Building design and detailed design of central heating system replacement. - 4 ex,- Technical specifications of execution and acceptance of works, pre-dimensions of works, investor's cost estimates - 1 ex,- Collective cost statement (net amount of PLN, VAT, gross) - 1 ex,- Design of energy performance together with analysis of the possibility of rational use of alternative systems of energy and heat supply - 4 ex,- Technical specifications of execution and acceptance of works, pre-dimensions of works, investor's cost estimates - 1 ex,- Collective cost statement (net amount of PLN, VAT, gross) - 1 ex,- Design of energy performance together with analysis of the possibility of rational use of alternative systems of energy and heat supply - 4 ex. Scope of study: - insulation of external aboveground and underground walls along with insulation of foundation walls, - insulation of the roof, - partial replacement of old window and door joinery, - replacement of lightning protection system, - replacement of heat source (gas boiler for cascade of gas boilers) taking into account the heat demand of the Kindergarten No. 18 building, which will be heated from the heat source located in the Primary School No. 16, - partial replacement of central heating system,- repair of basement transom lights (doświetlacze), - proper ventilation in the rooms through e.g. installation of wall ventilators or window ventilators (ventilators) - to be agreed with the customer, - replacement of external window sills, - repair of chimneys and ventilation openings, plastering and painting works to adjust their appearance to the façade,- reconstruction of rainwater sewage system approaches related to the removal of rainwater pipes and cleaners from the façade by the thickness of insulation and replacement of drain pipes and gutters, - reconstruction/renewal of roofs at entrances (including over the main entrance), - making a roof over the side entrance, - improving the aesthetics of the strip around the building after insulation of walls, - repair of all the elements related to the building, e.g.: - renovation of the roof on the entrances (including over the main entrance), - making a roof over the side entrance, - improving the aesthetics of the strip around the building after insulation of walls, - repair of all the elements related to the building, e.g. the roof, the roof, the roof, the roof, the roof, the roof... cornices, plinths, etc. and provide for all necessary works related to the insulation of the building, - temporary disassembly and assembly of devices/elements on the elevations of the building, e.g.: a. the building's façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade, a. the façade and the façade. removal of all disassembled metal/steel elements, e.g.: disassembled lightning protection system, window sills, metal sheets, pipes, gutters to the scrap yard, - repair/repair of stairs, renovation/replacement of window gratings, renewal of railings, etc.The design documentation must include: - Energy audit - 1 ex,- Building construction and executive design of thermal modernization of the building (the scope of the design must be consistent with the energy audit) - 4 ex,- Building construction and executive design of lightning protection system replacement - electrical industry - 4 ex,- Building construction and executive design of gas boiler replacement for new gas boilers (for SP16 and P-18) together with internal gas installation (the design should include: part II, III, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV, IV and IV. construction, technological part, electrical part) - 4 ex.- 4 ex.- 4 ex.- Building and detailed design of replacement of central heating installation. - 4 ex,- Technical specifications of execution and acceptance of works, pre-dimensions of works, investor's cost estimates - 1 ex,- Collective cost statement (net amount of PLN, VAT, gross) - 1 ex,- Design of energy performance together with analysis of the possibility of rational use of alternative systems of energy and heat supply - 4 ex,- Technical specifications of execution and acceptance of works, pre-dimensions of works, investor's cost estimates - 1 ex,- Collective cost statement (net amount of PLN, VAT, gross) - 1 ex,- Design of energy performance together with analysis of the possibility of rational use of alternative systems of energy and heat supply - 4 ex. Scope of study: - insulation of external overground and underground walls together with insulation of foundation walls, - insulation of the roof, - partial replacement of old window and door joinery, - replacement of lightning protection system, - replacement of central heating system,- repair of basement transom lights (doświetlacze), - proper ventilation in the rooms through e.g. installation of wall ventilators or window ventilators (ventilators) to be agreed with the Customer, - mechanical ventilation of the gymnasium, - replacement of external window sills, - repair of chimneys and ventilation openings, plastering and painting works on chimneys in order to adjust their appearance to the façade,- reconstruction of rainwater sewage system approaches related to the removal of rainwater pipes and cleaners from the façade by the thickness of insulation and replacement of drain pipes and gutters, - reconstruction/renewal of roofs at entrances (including over the main entrance), - making a roof over the side entrance, - improving the aesthetics of the strip around the building after insulation of walls, - repair of all the elements related to the building, e.g.: - renovation of the roof on the entrances (including over the main entrance), - making a roof over the side entrance, - improving the aesthetics of the strip around the building after insulation of walls, - repair of all the elements related to the building, e.g. the roof, the roof, the roof, the roof, the roof, the roof... cornices, plinths, etc. temporary disassembly and assembly of devices/elements on the facades of the building, e.g. sensor, lamps, boards, - flashings related to the facade insulation, - disposal of rubble and waste to a waste dump, - disposal of all disassembled metal/steel elements, e.g. metal/steel elements, e.g.: - installation of a sensor, lamps, boards, - flashings related to the facade insulation, - disposal of rubble and waste to a waste dump, - disposal of all disassembled metal/steel elements.repair/repair of stairs, renovation/replacement of window gratings, renewal/replacement of railings, etc., - repair/repair of stairs, renovation/replacement of window gratings, renewal of railings, etc.B/ Design documentation must include: - Energy audit - 1 ex,- Building construction and executive design of thermal modernization of the building (the scope of the design must be consistent with the energy audit) - 4 ex,- Building construction and executive design of lightning protection system replacement - electrical industry - 4 ex,- Building construction and executive design of central heating system replacement. - 4 ex,- Technical specifications of execution and acceptance of works, pre-dimensions of works, investor's cost estimates - 1 ex,- Collective cost statement (net amount of PLN, VAT, gross) - 1 ex,- Design of energy performance together with analysis of the possibility of rational use of alternative systems of energy and heat supply - 4 ex,- Technical specifications of execution and acceptance of works, pre-dimensions of works, investor's cost estimates - 1 ex,- Collective cost statement (net amount of PLN, VAT, gross) - 1 ex,- Design of energy performance together with analysis of the possibility of rational use of alternative systems of energy and heat supply - 4 ex. Scope of study: - insulation of external overground and underground walls together with insulation of the foundation walls of the kindergarten building and the building adjacent to the kindergarten (teacher's house - flat), - insulation of the roof of the kindergarten building and the building adjacent to the kindergarten, - partial replacement of old window and door woodwork, - replacement of lightning protection system, - renovation/modernization of the thermal centre, - proper ventilation in the rooms through, e.g., the renovation/modernisation of the heat distribution centre, - insulation of the roof of the kindergarten building and the building adjacent to the kindergarten, - replacement of the old window and door woodwork, - replacement of the lightning protection system, - renovation/modernisation of the heat distribution centre. installation of wall ventilators or window ventilators (ventilators) - to be agreed with the customer, - replacement of external window sills, - repair of chimneys and ventilation openings, plastering and painting works to adjust their appearance to the façade,- reconstruction of rainwater sewage system approaches related to the removal of rainwater pipes and cleaners from the façade by the thickness of insulation and replacement of drain pipes and gutters, - reconstruction/renewal of roofs at entrances (including over the main entrance), - making a roof over the side entrance, - improving the aesthetics of the strip around the building after insulation of walls, - repair of all the elements related to the building, e.g.: - renovation of the roof on the entrances (including over the main entrance), - making a roof over the side entrance, - improving the aesthetics of the strip around the building after insulation of walls, - repair of all the elements related to the building, e.g. the roof, the roof, the roof, the roof, the roof, the roof... cornices, plinths, etc. and provide for all necessary works related to building insulation, - temporary disassembly and assembly of devices/elements on building facades, e.g. sensor, lamps, boards, - flashings related to façade insulation, - disposal of rubble and waste to a landfill, - disposal of all disassembled metal/steel elements, e.g. metal/steel elements, e.g.: - transport of the building's interior, - disposal of the building's interior, - disposal of the building's interior, - disposal of the building's interior, - disposal of the building's exterior, - disposal of the building's exterior, - disposal of the building's exterior, - disposal of the building's exterior, - disposal of the building's exterior, - disposal of the building's exterior, - disposal of the building's exterior, - disposal of the building's exterior, - disposal of the building's exterior.repair/repair of stairs, renovation/replacement of window gratings, renewal/replacement of railings, etc., - repair/repair of stairs, renovation/replacement of window gratings, renewal of railings, etc.The design documentation must include: - Energy audit - 1 ex,- Building construction and executive design of thermal modernization of the building (the scope of the design must be consistent with the energy audit) - 4 ex,- Building construction and executive design of lightning protection system replacement - electrical industry - 4 ex,- Building construction and executive design of central heating system replacement. - 4 ex,- Building and executive design of heat substation replacement - 4 ex,- Technical specifications for the execution and acceptance of works, pre-dimensions of works, investor's cost estimates - 1 ex,- Collective cost statement (net amount PLN, VAT, gross) - 1 ex,- Projected energy performance together with the analysis of the possibility of rational use of alternative systems of energy and heat supply - 4 ex,- Technical specifications for the execution and acceptance of works, pre-dimensions of works, investor's cost estimates - 1 ex,- Collective cost statement (net amount PLN, VAT, gross) - 1 ex,- Projected energy performance together with the analysis of the possibility of rational use of alternative systems of energy and heat supply - 4 ex.

Opportunity closing date
06 December 2019
Value of contract
£0-100k

About the buyer

Address
Miasto Rybnik ul. Bolesława Chrobrego 2 Rybnik 44-200 Poland
Contact
rybnik@um.rybnik.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?