Germany - Architectural, engineering and surveying services

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
23 September 2019
Opportunity publication date
20 August 2019
Category
71250000: Architectural, engineering and surveying services
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Lot 1 Directorate ErfurtCharge 1Binding period for the local recording of all required data 5. to 23 KW 2020PLZ areas: 01773 - 03130 186 Buildings approx. 170 292 m2 BGFCharge 2Binding period for the local recording of all required data 24. - 37. KW 2020PLZ areas: 04600 - 09544 94 Buildings approx. 166 749 m2 BGFCharge 3Binding period for the local recording of all required data 38 to 49 KW 2020PLZ areas: 07546 - 99706 97 Buildings approx. 117 852 m2 BGFThe contractor's services consist of 2 subtasks.1) The contractor has to check 84 accessibility features in the federal government's service properties with the help of an app programmed by the client due to local conditions. The app is based on a system developed by the Bundesfachstelle für Barrierefreiheit (Federal Office for Accessibility) which has to be processed in the manner of a checklist. The App shall be installed by the Contractor on tablets to be provided by the Contractor, which must comply with the more detailed specification of the service description. The contractor shall develop reports on the status of accessibility from the 84 accessibility features recorded in each case, with the program automatically reporting on the status. With this partial task, a legal requirement from § 8 Paragraph 3 of the Disability Equality Act (BBG) is fulfilled.2) The reports on the status of accessibility must be submitted by the contractor no later than 31.12.2020. With the aid of as-built plans and other as-built documents and using the results of findings and measurements on site, the contractor shall draw up qualified 2-D CAD floor plans for the federal government's service properties, which the customer can integrate into its SAP Visual Enterprise System. In these plans, the Contractor shall also enter the accessibility features determined in Subtask 1. The complete CAD plans and Excel room books for all properties must be submitted by the contractor by 31.12.2021 at the latest.If local observations and measurements in the properties are necessary for the fulfilment of the two subtasks, these must be carried out in the dates specified by the client between the 5th and the 49th week of 2019. The employees of the contractor who record the accessibility features and prepare the reports on the status of accessibility must be trained prior to the start of their activities. In the 2nd - 4th calendar week 2020, training courses will be held in Berlin, which will also include instruction on how the app works and how to use it. Lot 2 Directorate FreiburgCharge 1Binding period for the local recording of all required data 5 - 12 KW 2020PLZ areas: 70182 - 72072 68 buildings approx. 103,838 m2 BGFCharge 2Binding period for the local recording of all required data 13 - 26 KW 2020PLZ areas: 75305 - 77871 110 buildings approx. 190.568 m2 BGFCharge 3Binding period for the local recording of all required data 41 - 49 KW 2020PLZ areas: 67061 - 97877 119 buildings approx. 97,449 m2 BGFCharge 4Binding period for the local recording of all required data 27 - 40 KW 2020PLZ areas: 78176 - 89075 299 buildings approx. 116,995 m2 BGFThe services of the contractor consist of two subtasks.1The Contractor shall examine 84 accessibility features in the Federal Government's service properties with the aid of an app programmed by the Principal on the basis of local conditions. The app is based on a system developed by the Bundesfachstelle für Barrierefreiheit (Federal Office for Accessibility) which has to be processed in the manner of a checklist. The App shall be installed by the Contractor on tablets to be provided by the Contractor, which must comply with the more detailed specification of the service description. The contractor shall develop reports on the status of accessibility from the 84 accessibility features recorded in each case, with the program automatically reporting on the status. With this partial task, a legal requirement from § 8 Paragraph 3 of the Disability Equality Act (BBG) is fulfilled.2 The reports on the status of accessibility must be submitted by the contractor by 31.12.2020 at the latest.2 The contractor must draw up qualified 2-D CAD floor plans for the federal government's service properties with the aid of as-built plans and other as-built documents and using the results of findings and measurements on site, which the client can integrate into its SAP Visual Enterprise System. In these plans, the Contractor shall also enter the accessibility features determined in Subtask 1. The complete CAD plans and Excel room books for all properties must be submitted by the contractor by 31.12.2021 at the latest.If local observations and measurements in the properties are necessary for the fulfilment of the two subtasks, these must be carried out in the dates specified by the client between the 5th and the 49th week of 2019. The employees of the contractor who record the accessibility features and prepare the reports on the status of accessibility must be trained prior to the start of their activities. In the 2nd - 4th calendar week 2020, training courses will be held in Berlin, which will also include instruction on how the app works and how to use it. Lot 3 Directorate KoblenzCharge 1Binding period for the local recording of all required data 5 - 13 KW 2020PLZ areas: 34454 - 37269 132 buildings approx. 214,962 m2 BGFCharge 2Binding period for the local recording of all required data 14 - 22 KW 2020PLZ areas: 35216 - 63607 103 buildings approx. 215.926 m2 BGFCharge 3Binding period for the local recording of all required data 23 - 34 KW 2020PLZ areas: 65582 - 65203 90 buildings approx. 325,478 m2 BGFCharge 4Binding period for the local recording of all required data 35 - 49 KW 2020PLZ areas: 54634 - 68519 342 buildings approx. 323,288 m2 BGFThe services of the contractor consist of two subtasks.1The Contractor shall examine 84 accessibility features in the Federal Government's service properties with the aid of an app programmed by the Principal on the basis of local conditions. The app is based on a system developed by the Bundesfachstelle für Barrierefreiheit (Federal Office for Accessibility) which has to be processed in the manner of a checklist. The App shall be installed by the Contractor on tablets to be provided by the Contractor, which must comply with the more detailed specification of the service description. The contractor shall develop reports on the status of accessibility from the 84 accessibility features recorded in each case, with the program automatically reporting on the status. With this partial task, a legal requirement from § 8 Paragraph 3 of the Disability Equality Act (BBG) is fulfilled.2 The reports on the status of accessibility must be submitted by the contractor by 31.12.2020 at the latest.2 The contractor must draw up qualified 2-D CAD floor plans for the federal government's service properties with the aid of as-built plans and other as-built documents and using the results of findings and measurements on site, which the client can integrate into its SAP Visual Enterprise System. In these plans, the Contractor shall also enter the accessibility features determined in Subtask 1. The complete CAD plans and Excel room books for all properties must be submitted by the contractor by 31.12.2021 at the latest.If local observations and measurements in the properties are necessary for the fulfilment of the two subtasks, these must be carried out in the dates specified by the client between the 5th and the 49th week of 2019. The employees of the contractor who record the accessibility features and prepare the reports on the status of accessibility must be trained prior to the start of their activities. In the 2nd - 4th calendar week 2020, training courses will be held in Berlin, which will also include instruction on how the app works and how to use it. Lot 4 Directorate MagdeburgCharge 1Binding period for the local recording of all required data 5 - 15 KW 2020PLZ areas: 06846 - 39576 252 Buildings approx. 294,364 m2 BGFCharge 2Binding period for the local recording of all required data 28 - 35 KW 2020PLZ areas: 21354 - 49082 339 Buildings approx. 193.696 m2 BGFCharge 3Binding period for the local recording of all required data 16 - 27 KW 2020PLZ areas: 30159 - 37520 259 Buildings approx. 329,963 m2 BGFCharge 4Binding period for the local recording of all required data 36 - 49 KW 2020PLZ areas: 38104 - 38442 289 Buildings approx. 430,704 m2 BGFThe services of the contractor consist of two subtasks.1The Contractor shall examine 84 accessibility features in the Federal Government's service properties with the aid of an app programmed by the Principal on the basis of local conditions. The app is based on a system developed by the Bundesfachstelle für Barrierefreiheit (Federal Office for Accessibility) which has to be processed in the manner of a checklist. The App shall be installed by the Contractor on tablets to be provided by the Contractor, which must comply with the more detailed specification of the service description. The contractor shall develop reports on the status of accessibility from the 84 accessibility features recorded in each case, with the program automatically reporting on the status. With this partial task, a legal requirement from § 8 Paragraph 3 of the Disability Equality Act (BBG) is fulfilled.2 The reports on the status of accessibility must be submitted by the contractor by 31.12.2020 at the latest.2 The contractor must draw up qualified 2-D CAD floor plans for the federal government's service properties with the aid of as-built plans and other as-built documents and using the results of findings and measurements on site, which the client can integrate into its SAP Visual Enterprise System. In these plans, the Contractor shall also enter the accessibility features determined in Subtask 1. The complete CAD plans and Excel room books for all properties must be submitted by the contractor by 31.12.2021 at the latest.If local observations and measurements in the properties are necessary for the fulfilment of the two subtasks, these must be carried out in the dates specified by the client between the 5th and the 49th week of 2019. The employees of the contractor who record the accessibility features and prepare the reports on the status of accessibility must be trained prior to the start of their activities. In the 2nd - 4th calendar week 2020, training courses will be held in Berlin, which will also include instruction on how the app works and how to use it. Lot 5 Direktion MünchenCharge 1Binding period for the local recording of all required data 14 - 28 KW 2020PLZ areas: 80331 - 83278 198 buildings approx. 427,005 m2 BGFCharge 2Binding period for the local recording of all required data 29 - 37 KW 2020PLZ areas: 82256 - 89231 129 buildings approx. 268.322 m2 BGFCharge 3Binding period for the local recording of all required data 5 - 13 KW 2020PLZ areas: 84030 - 94227 260 buildings approx. 193,477 m2 BGFCharge 4Binding period for the local recording of all required data 38 - 49 KW 2020PLZ areas: 92271 - 63785 327 buildings approx. 236,070 m2 BGFThe services of the contractor consist of two subtasks.1The Contractor shall examine 84 accessibility features in the Federal Government's service properties with the aid of an app programmed by the Principal on the basis of local conditions. The app is based on a system developed by the Bundesfachstelle für Barrierefreiheit (Federal Office for Accessibility) which has to be processed in the manner of a checklist. The App shall be installed by the Contractor on tablets to be provided by the Contractor, which must comply with the more detailed specification of the service description. The contractor shall develop reports on the status of accessibility from the 84 accessibility features recorded in each case, with the program automatically reporting on the status. With this partial task, a legal requirement from § 8 Paragraph 3 of the Disability Equality Act (BBG) is fulfilled.2 The reports on the status of accessibility must be submitted by the contractor by 31.12.2020 at the latest.2 The contractor must draw up qualified 2-D CAD floor plans for the federal government's service properties with the aid of as-built plans and other as-built documents and using the results of findings and measurements on site, which the client can integrate into its SAP Visual Enterprise System. In these plans, the Contractor shall also enter the accessibility features determined in Subtask 1. The complete CAD plans and Excel room books for all properties must be submitted by the contractor by 31.12.2021 at the latest.If local observations and measurements in the properties are necessary for the fulfilment of the two subtasks, these must be carried out in the dates specified by the client between the 5th and the 49th week of 2019. The employees of the contractor who record the accessibility features and prepare the reports on the status of accessibility must be trained prior to the start of their activities. In the 2nd - 4th calendar week 2020, training courses will be held in Berlin, which will also include instruction on how the app works and how to use it. Lot 6 Directorate PotsdamCharge 1Binding period for the local recording of all required data 5 - 22 KW 2020PLZ areas: 03044 - 15377 183 Buildings approx. 191,609 m2 BGFCharge 2Binding period for the local recording of all required data 23 - 49 KW 2020PLZ areas: 12205 - 19322 183 Buildings approx. 275,775 m2 BGFThe services of the contractor consist of two subtasks.1The Contractor shall examine 84 accessibility features in the Federal Government's service properties with the aid of an app programmed by the Principal on the basis of local conditions. The app is based on a system developed by the Bundesfachstelle für Barrierefreiheit (Federal Office for Accessibility) which has to be processed in the manner of a checklist. The App shall be installed by the Contractor on tablets to be provided by the Contractor, which must comply with the more detailed specification of the service description. The contractor shall develop reports on the status of accessibility from the 84 accessibility features recorded in each case, with the program automatically reporting on the status. With this partial task, a legal requirement from § 8 Paragraph 3 of the Disability Equality Act (BBG) is fulfilled.2 The reports on the status of accessibility must be submitted by the contractor by 31.12.2020 at the latest.2 The contractor must draw up qualified 2-D CAD floor plans for the federal government's service properties with the aid of as-built plans and other as-built documents and using the results of findings and measurements on site, which the client can integrate into its SAP Visual Enterprise System. In these plans, the Contractor shall also enter the accessibility features determined in Subtask 1. The complete CAD plans and Excel room books for all properties must be submitted by the contractor by 31.12.2021 at the latest.If local observations and measurements in the properties are necessary for the fulfilment of the two subtasks, these must be carried out in the dates specified by the client between the 5th and the 49th week of 2019. The employees of the contractor who record the accessibility features and prepare the reports on the status of accessibility must be trained prior to the start of their activities. In the 2nd - 4th calendar week 2020, training courses will be held in Berlin, which will also include instruction on how the app works and how to use it. Lot 7 Directorate RostockCharge 1Binding period for the local recording of all required data 35 - 49 KW 2020PLZ areas: 17375 - 19412 335 Buildings approx. 352,893 m2 BGFCharge 2Binding period for the local recording of all required data 5 - 19 KW 2020PLZ areas: 17375 - 19412 335 Buildings approx. 352,893 m2 BGFCharge 2Binding period for the local recording of all required data 5 - 19 KW 2020PLZ areas: 17375 - 19412 335 Buildings approx. 352,893 m2 BGFCharge 2Binding period for the local recording of all required data KW 2020PLZ areas: 20148 - 23966 263 Buildings approx. 341,746 m2 BGFCharge 3Binding period for the local recording of all required data 20 - 34 KW 2020PLZ areas: 21502 - 25980 316 Buildings approx. 358,387 m2 BGFThe contractor's services consist of two subtasks.1The Contractor shall examine 84 accessibility features in the Federal Government's service properties with the aid of an app programmed by the Principal on the basis of local conditions. The app is based on a system developed by the Bundesfachstelle für Barrierefreiheit (Federal Office for Accessibility) which has to be processed in the manner of a checklist. The App shall be installed by the Contractor on tablets to be provided by the Contractor, which must comply with the more detailed specification of the service description. The contractor shall develop reports on the status of accessibility from the 84 accessibility features recorded in each case, with the program automatically reporting on the status. With this partial task, a legal requirement from § 8 Paragraph 3 of the Disability Equality Act (BBG) is fulfilled.2 The reports on the status of accessibility must be submitted by the contractor by 31.12.2020 at the latest.2 The contractor must draw up qualified 2-D CAD floor plans for the federal government's service properties with the aid of as-built plans and other as-built documents and using the results of findings and measurements on site, which the client can integrate into its SAP Visual Enterprise System. In these plans, the Contractor shall also enter the accessibility features determined in Subtask 1. The complete CAD plans and Excel room books for all properties must be submitted by the contractor by 31.12.2021 at the latest.If local observations and measurements in the properties are necessary for the fulfilment of the two subtasks, these must be carried out in the dates specified by the client between the 5th and the 49th week of 2019. The employees of the contractor who record the accessibility features and prepare the reports on the status of accessibility must be trained prior to the start of their activities. In the 2nd - 4th calendar week 2020, training courses will be held in Berlin, which will also include instruction on how the app works and how to use it. Lot 8 Directorate DortmundCharge 1Binding period for the local recording of all required data 5 - 21 KW 2020PLZ areas: 32832 - 46487 398 Buildings approx. 419,657 m2 BGFCharge 2Binding period for the local recording of all required data 22 - 37 KW 2020PLZ areas: 32832 - 46487 398 Buildings approx. 419,657 m2 BGFCharge 2Binding period for the local recording of all required data 22 - 37 KW 2020PLZ areas: 32832 - 46487 398 Buildings approx. 419,657 m2 BGFCharge 2Binding period for the local recording of all required data KW 2020PLZ areas: 40470 - 52222 214 Buildings approx. 475,802 m2 BGFCharge 3Binding period for the local recording of all required data 38 - 49 KW 2020PLZ areas: 53604 - 53842 171 Buildings approx. 353,664 m2 BGFThe contractor's services consist of two subtasks.1The Contractor shall examine 84 accessibility features in the Federal Government's service properties with the aid of an app programmed by the Principal on the basis of local conditions. The app is based on a system developed by the Bundesfachstelle für Barrierefreiheit (Federal Office for Accessibility) which has to be processed in the manner of a checklist. The App shall be installed by the Contractor on tablets to be provided by the Contractor, which must comply with the more detailed specification of the service description. The contractor shall develop reports on the status of accessibility from the 84 accessibility features recorded in each case, with the program automatically reporting on the status. With this partial task, a legal requirement from § 8 Paragraph 3 of the Disability Equality Act (BBG) is fulfilled.2 The reports on the status of accessibility must be submitted by the contractor by 31.12.2020 at the latest.2 The contractor must draw up qualified 2-D CAD floor plans for the federal government's service properties with the aid of as-built plans and other as-built documents and using the results of findings and measurements on site, which the client can integrate into its SAP Visual Enterprise System. In these plans, the Contractor shall also enter the accessibility features determined in Subtask 1. The complete CAD plans and Excel room books for all properties must be submitted by the contractor by 31.12.2021 at the latest.If local observations and measurements in the properties are necessary for the fulfilment of the two subtasks, these must be carried out in the dates specified by the client between the 5th and the 49th week of 2019. The employees of the contractor who record the accessibility features and prepare the reports on the status of accessibility must be trained prior to the start of their activities. In the 2nd - 4th calendar week 2020, training courses will be held in Berlin, which will also include instruction on how the app works and how to use it. Lot 9 BonnCharge headquarters 1Binding period for the local recording of all required data 5 - 49 KW 2020PLZ areas: 53113 - 53229 219 buildings approx. 1,422,964 m2 gross floor areaThe contractor's services consist of two subtasks.1 The contractor has to check 84 accessibility features in the federal government's service properties with the aid of an app programmed by the client based on local conditions. The app is based on a system developed by the Bundesfachstelle für Barrierefreiheit (Federal Office for Accessibility) which has to be processed in the manner of a checklist. The App shall be installed by the Contractor on tablets to be provided by the Contractor, which must comply with the more detailed specification of the service description. The contractor shall develop reports on the status of accessibility from the 84 accessibility features recorded in each case, with the program automatically reporting on the status. With this partial task, a legal requirement from § 8 Paragraph 3 of the Disability Equality Act (BBG) is fulfilled.2 The reports on the status of accessibility must be submitted by the contractor by 31.12.2020 at the latest.2 The contractor must draw up qualified 2-D CAD floor plans for the federal government's service properties with the aid of as-built plans and other as-built documents and using the results of findings and measurements on site, which the client can integrate into its SAP Visual Enterprise System. In these plans, the Contractor shall also enter the accessibility features determined in Subtask 1. The complete CAD plans and Excel room books for all properties must be submitted by the contractor by 31.12.2021 at the latest.If local observations and measurements in the properties are necessary for the fulfilment of the two subtasks, these must be carried out in the dates specified by the client between the 5th and the 49th week of 2019. The employees of the contractor who record the accessibility features and prepare the reports on the status of accessibility must be trained prior to the start of their activities. In the 2nd - 4th calendar week 2020, training courses will be held in Berlin, which will also include instruction on how the app works and how to use it. Lot 10 Directorate BerlinCharge 1Binding period for the local recording of all required data 5 - 19 KW 2020PLZ areas: 10115 - 14195 137 buildings approx. 648,879 m2 BGFCharge 2Binding period for the local recording of all required data 20 KW 2020PLZ areas: 10115 - 14195 137 buildings approx. 648,879 m2 BGFCharge 2Binding period for the local recording of all required data - 34 KW 2020PLZ areas: 10117 - 14195 159 Buildings approx. 655,926 m2 BGFCharge 3Binding period for the local recording of all required data 35 - 49 KW 2020PLZ areas: 10115 - 82049 181 Buildings approx. 621,131 m2 BGFThe services of the contractor consist of two subtasks.1The Contractor shall examine 84 accessibility features in the Federal Government's service properties with the aid of an app programmed by the Principal on the basis of local conditions. The app is based on a system developed by the Bundesfachstelle für Barrierefreiheit (Federal Office for Accessibility) which has to be processed in the manner of a checklist. The App shall be installed by the Contractor on tablets to be provided by the Contractor, which must comply with the more detailed specification of the service description. The contractor shall develop reports on the status of accessibility from the 84 accessibility features recorded in each case, with the program automatically reporting on the status. With this partial task, a legal requirement from § 8 Paragraph 3 of the Disability Equality Act (BBG) is fulfilled.2 The reports on the status of accessibility must be submitted by the contractor by 31.12.2020 at the latest.2 The contractor must draw up qualified 2-D CAD floor plans for the federal government's service properties with the aid of as-built plans and other as-built documents and using the results of findings and measurements on site, which the client can integrate into its SAP Visual Enterprise System. In these plans, the Contractor shall also enter the accessibility features determined in Subtask 1. The complete CAD plans and Excel room books for all properties must be submitted by the contractor by 31.12.2021 at the latest.If local observations and measurements in the properties are necessary for the fulfilment of the two subtasks, these must be carried out in the dates specified by the client between the 5th and the 49th week of 2019. The employees of the contractor who record the accessibility features and prepare the reports on the status of accessibility must be trained prior to the start of their activities. In the 2nd - 4th calendar week 2020, training courses will be held in Berlin, which will also include instruction on how the app works and how to use it. Lot 11 Federal Ministry of the Interior, for Construction and Home (BMI)Charge 1Binding period for the local recording of all required data 5 - 49 KW 2020PLZ areas: 10115 - 15738 53 buildings approx. 295,255 m2 GFAThe services of the contractor consist of two subtasks.1.The contractor has to examine 84 accessibility features in the federal government's service properties with the help of an app programmed by the client due to local conditions. The app is based on a system developed by the Bundesfachstelle für Barrierefreiheit (Federal Office for Accessibility) which has to be processed in the manner of a checklist. The App shall be installed by the Contractor on tablets to be provided by the Contractor, which must comply with the more detailed specification of the service description. The contractor shall develop reports on the status of accessibility from the 84 accessibility features recorded in each case, with the program automatically reporting on the status. With this partial task, a legal requirement from § 8 Paragraph 3 of the Disability Equality Act (BBG) is fulfilled.2 The reports on the status of accessibility must be submitted by the contractor by 31.12.2020 at the latest.2 The contractor must draw up qualified 2-D CAD floor plans for the federal government's service properties with the aid of as-built plans and other as-built documents and using the results of findings and measurements on site, which the client can integrate into its SAP Visual Enterprise System. In these plans, the Contractor shall also enter the accessibility features determined in Subtask 1. The complete CAD plans and Excel room books for all properties must be submitted by the contractor by 31.12.2021 at the latest.If local observations and measurements in the properties are necessary for the fulfilment of the two subtasks, these must be carried out in the dates specified by the client between the 5th and the 49th week of 2019. The employees of the contractor who record the accessibility features and prepare the reports on the status of accessibility must be trained prior to the start of their activities. In the 2nd - 4th calendar week 2020, training courses will be held in Berlin, which will also include instruction on how the app works and how to use it.

Opportunity closing date
23 September 2019
Value of contract
to be confirmed

About the buyer

Address
Bundesanstalt für Immobilienaufgaben Fasanenstraße 87 Berlin 10623 Germany
Contact
verdingung@bundesimmobilien.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?