Poland - Architectural, engineering and surveying services

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
19 November 2019
Opportunity publication date
16 October 2019
Category
71250000: Architectural, engineering and surveying services
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The subject matter of the contract is to prepare multi-discipline design documentation for the task entitled "Adaptation to fire safety requirements of the building No. 34 at Włocławska Street 239 in Toruń'2. Guidelines for the implementation of the subject of the contract;- the scope of the design documentation includes protection against smoking of corridors with a length exceeding 50 m, constituting an escape route, pursuant to § 243 section 1. Regulation of the Minister of Infrastructure of 12 April 2002 on the technical conditions to be met by buildings and their location (Journal of Laws of 2019, item 1065) and other security measures resulting from the provision of the Municipal Headquarters of the State Fire Service issued by the Municipal Headquarters of the State Fire Service - mark MZ.5580.76.3.2015 of 4 September 2015, - adjustment to fire regulations shall be carried out in accordance with the Decision of the Municipal Headquarters of the State Fire Service MR 5580-74/3/08 of 28 April 2008 and the Decision of the Municipal Headquarters of the State Fire Service MZ.5580.76.3.2015 of 4 September 2015. within the scope of design works it is necessary to provide also participation in meetings of the nature of a speaker and to make a multimedia presentation of the prepared studies, - for all designed works it is necessary to use materials of the standard appropriate for this type of objects. Materials and technologies adopted by the designer should have specified required technical parameters and given conditions to be met to ensure equivalence of materials. by NEOEnergetyka sp. z o.o. Warsaw, Poland, published in January 2018).3. List of studies included in the subject matter of the contract: 1) multi-discipline construction design containing all elements of the executive design and information concerning safety and health protection (if required),2) technical specification of execution and acceptance of construction works (all industries) + electronic version (pdf format + editable version),3) workmiar + electronic version (pdf format and ath),4) investor's cost estimate - electronic version (pdf format and ath),5) collective list of all investment costs ("ZZK"), including the resulting m.6) other studies necessary to fulfil all assumed functions and obtain the construction permit/ or, if the construction permit is not required, to notify the intention to commence the construction works, 7) design documentation also in electronic form in pdf, doc, dwg format (AutoCAD 2008).The subject matter of the contract also includes: 1) preparation of a system map on a scale of 1 :500 for design purposes,2) provision of a map of the register of the area covered by the planned investment along with an extract from the register of land,3) preparation of documents for the Contracting Authority to apply for the required administrative decisions, including, but not limited to decision on the building permit/ or, if the building permit is not required - to submit the intention to commence construction works and other applications required for the design and execution of the project [relevant complete applications prepared by the Contractor with required attachments to the Contracting Authority's signature],4) transfer of economic copyrights to the project documentation to the Contracting Authority within the scope of the contract, according to the rules described in § of template 8 of the contract.5The Contractor undertakes to perform the subject of the contract in accordance with the rules of modern technical knowledge, regulations, technical specifications and standards in force in this respect, based on a visual inspection of the investment area, the offer accepted by the Contracting Authority and the model contract. The subject matter of the contract is to prepare multi-discipline design documentation for the task entitled "Adaptation to fire safety requirements of the facility no. 1 at Wielkie Garbary 9 in Toruń ".2. Guidelines for the implementation of the subject of the contract: - the scope of the design documentation includes protection against smoking of corridors with a length exceeding 50 m, constituting an evacuation route, in accordance with § 243 section 1 Regulation of the Minister of Infrastructure of 12 April 2002 on technical conditions to be met by buildings and their location (Journal of Laws of 2019, item 1065), - adaptation to fire regulations should be carried out in accordance with the Decision of the Municipal Headquarters of the State Fire Service MZ 5580-99-3/11 of 18 October 2011. the scope of design works includes the inventory of the object in the scope required for the execution of the project, - the design works should also include participation in meetings of the nature of a speaker and a multimedia presentation of the prepared studies - for all designed works the materials of the standard appropriate for this type of objects should be used. Materials and technologies adopted by the designer should have specified required technical parameters and given conditions to be met to ensure equivalence of materials. wyk. przez Goldman & White Line Architects, Poznań, date of publication: November 2017).3. List of studies included in the subject matter of the contract: 1) multi-discipline construction design containing all elements of the executive design and information concerning safety and health protection (if required),2) technical specification of execution and acceptance of construction works (all industries) + electronic version (pdf format + editable version),3) workmiar + electronic version (pdf format and ath),4) investor's cost estimate - electronic version (pdf format and ath),5) collective list of all investment costs ("ZZK"), including the resulting m.6) other studies necessary to fulfil all assumed functions and obtain the construction permit/ or, if the construction permit is not required, to notify the intention to commence the construction works, 7) design documentation also in electronic form in pdf, doc, dwg format (AutoCAD 2008).The subject matter of the contract also includes: 1) preparation of a system map - raised on a scale of 1:500 for design purposes,2) delivery of a map of the register of the area covered by the planned investment along with an extract from the register of land,3) preparation of documents for the Contracting Authority to apply for the required administrative decisions, including, but not limited to decision on the building permit/ or, if the building permit is not required - to submit the intention to commence construction works and other applications required for the design and execution of the project [relevant complete applications prepared by the Contractor with required attachments to the Contracting Authority's signature],4) transfer of economic copyrights to the project documentation to the Contracting Authority within the scope of the contract, according to the rules described in § of template 8 of the contract.5 The Contractor undertakes to perform the subject of the contract in accordance with the rules of modern technical knowledge, regulations, technical specifications and standards in force in this respect, based on a visual inspection of the investment area, the offer accepted by the Contracting Authority and the model contract. The subject matter of the contract is to prepare multi-discipline design documentation for the task entitled "Adaptation to fire safety requirements of the building No. 19 at Dziewulskiego Street 41c in Toruń". 2. Guidelines for the implementation of the subject of the contract: - the scope of the design documentation includes protection against smoking of corridors with a length exceeding 50 m, constituting an escape route, in accordance with § 243 section 1 Regulation of the Minister of Infrastructure of 12 April 2002 on technical conditions to be met by buildings and their location (Journal of Laws of 2019, item 1065), - adaptation to fire regulations should be carried out in accordance with the Decision of the Municipal Headquarters of the State Fire Service MR 5581-129-3/07 of 28 November 2007. the scope of design works includes the inventory of the object in the scope required for the execution of the project, - the design works should also include participation in meetings of the nature of a speaker and a multimedia presentation of the prepared studies, - all designed works should use materials of a standard appropriate for this type of objects. Materials and technologies adopted by the designer should have specified required technical parameters and given conditions to be met to ensure equivalence of materials. wyk. przez Pracownia Audytorską inż. Jacek Stępień, Ostrowiec Św, Date of publication: July 2013).3. List of studies included in the subject matter of the contract: 1) multi-discipline construction design containing all elements of the executive design and information concerning safety and health protection (if required),2) technical specification of execution and acceptance of construction works (all industries) + electronic version (pdf format + editable version),3) workmiar + electronic version (pdf format and ath),4) investor's cost estimate - electronic version (pdf format and ath),5) collective list of all investment costs ("ZZK"), including the resulting m.6) other studies necessary to fulfil all assumed functions and obtain the construction permit/ or, if the construction permit is not required, to notify the intention to commence the construction works, 7) design documentation also in electronic form in pdf, doc, dwg format (AutoCAD 2008).The subject matter of the contract also includes: 1) preparation of a system map on a scale of 1 :500 for design purposes,2) provision of a map of the register of the area covered by the planned investment along with an extract from the register of land,3) preparation of documents for the Contracting Authority to apply for the required administrative decisions, including, but not limited to decision on the building permit/ or, if the building permit is not required - to submit the intention to commence construction works and other applications required for the design and execution of the project [relevant complete applications with required attachments to the signature by the Contracting Authority prepared by the Contractor],4) transfer of economic copyrights to the project documentation to the Contracting Authority within the scope of the contract, according to the principles described in § model 8 of the contract.1.3.5 The Contractor undertakes to perform the subject of the contract in accordance with the rules of modern technical knowledge, regulations, technical specifications and standards in force in this respect, based on an inspection of the investment site, the offer accepted by the Contracting Authority and the model contract. The subject matter of the contract is to prepare multi-discipline design documentation for the task entitled "Adaptation to fire safety requirements of the ZSIŚ facility at 43-49 Batory Street in Toruń. "2. The period of design documentation includes protection against smoking of corridors with a length exceeding 50 m, constituting an evacuation route, - adaptation of the length of the evacuation route in the dormitory building to the requirements in § 256 section 3. Regulation of the Minister of Infrastructure of 12 April 2002 on technical conditions to be met by buildings and their location (Journal of Laws of 2019, item 1065), - adaptation to fire regulations should be carried out in accordance with Decisions of the Municipal Headquarters of the State Fire Service: MR 5581-24/3/08 of 08 July 2008 and MR-5580-59/3/08 of 21 April 2008. within the scope of design works it is necessary to provide also participation in meetings of the nature of a speaker and to make a multimedia presentation of the prepared studies, - for all designed works it is necessary to use materials of the standard appropriate for this type of objects. Materials and technologies adopted by the designer should have specified the required technical parameters and conditions to be met to ensure equivalence of materials, - for illustrative purposes, the ToR contains projections in dwg format (developed by Satoris s.c. Toruń, developed in 2011).3. List of studies included in the subject matter of the contract: 1) multi-discipline construction design containing all elements of the executive design and information concerning safety and health protection (if required),2) technical specification of execution and acceptance of construction works (all industries) + electronic version (pdf format + editable version),3) workmiar + electronic version (pdf format and ath),4) investor's cost estimate - electronic version (pdf format and ath),5) summary list of all investment costs ("ZZK"), including those resulting from, among others, the following 6) other studies necessary to fulfil all assumed functions and obtain a construction permit or, if a construction permit is not required, to notify the intention to commence construction works,7) design documentation also in electronic version in pdf, doc, dwg format (AutoCAD 2008).4. in the scale 1:500 for project purposes,2) providing a map of the register of the area covered by the planned investment along with an extract from the register of land,3) preparing documents for the Contracting Authority to apply for the required administrative decisions, such as decision on the building permit/ or, if the building permit is not required - to submit the intention to commence construction works and other applications required for the design and execution of the project [relevant complete applications prepared by the Contractor with required attachments to the Contracting Authority's signature],4) transfer of economic copyrights to the project documentation to the Contracting Authority within the scope of the contract, according to the rules described in § of template 8 of the contract.5 The Contractor undertakes to perform the subject of the contract in accordance with the rules of modern technical knowledge, regulations, technical specifications and standards in force in this respect, based on a visual inspection of the investment area, the offer accepted by the Contracting Authority and the model contract.

Opportunity closing date
19 November 2019
Value of contract
to be confirmed

About the buyer

Address
Gmina Miasta Toruń Wały gen. Sikorskiego 8 Toruń 87-100 Poland
Contact
wp@um.torun.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?