Poland - Architectural design services
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 16 April 2020
- Opportunity publication date
- 13 March 2020
- Category
- 71220000: Architectural design services
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Characteristics of the area intended for developmentThe investment is located in the military complex no. 3656 on the real estate, marked as register plot no. 13 from 2-02-09 Warszawa Ochota district. The property of the State Treasury in the permanent management board of the Social Insurance Institution (SZI), regulated in the land and mortgage register KW WA1M/00038303/3. The area intended for the new facility is developed, separated from Wawelska street and the neighbouring city plots by a brick fence. There are buildings No. 29, 30, 32, 34 and 35 on the plot. Buildings No. 27, 28 and 31 have been demolished, only storeys -1 remain. The plot is equipped with water supply, sewage, gas, electricity and teletechnical networks. It has access roads (two entrances from Wawelska Street and one from the complex). The scope of design works is determined by the technical documentation prepared in 2015, made on the basis of minimum military organizational and utility requirements and the approved investment program of 5.3.2015.The material scope of the planned project includes: - completion of the demolition works of the storey -1 of buildings No. 27 and 28 and 31 together with preparation of the land for the construction of a new administrative and staff building.- construction of a new building with administrative and staff function.The designed building should be equipped with office and staff rooms for about 400-450 people. The ground floor of the building should be adapted for the disabled (driveway to the building, toilets). Due to the location of the area intended for development, the building should be a two-part T-shaped building. Part A should be situated parallel to Wawelska Street, part B should be situated perpendicularly to part A. Basic parameters of the building are foreseen: - cubic capacity: about 42 000,0 m3,- usable area: about 8 800,0 m2,- height of the building: about 20 m.The building should have 5 overground storeys and 1 underground storey.The building should be equipped with all required installations, including air-conditioning, electronic systems for securing specified areas: The building shall be equipped with all required installations, including air-conditioning, electronic systems for protecting specified areas: SSP, SA, SKD, TSN (e.g. a briefing room for secret clearance). The required media connections and the communication system of pedestrian and traffic routes shall be made. The characteristics of the building's construction according to the user's needs - developed technical documentation (documents to be viewed at the Customer's premises).
- Opportunity closing date
- 16 April 2020
- Value of contract
- to be confirmed
About the buyer
- Address
- Stołeczny Zarząd Infrastruktury Al. Jerozolimskie 97 Warszawa 00-909 Poland
- Contact
- szi.jedz@ron.mil.pl
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.